When we use the concrete laser leveling machine for construction, we need to understand some relevant technical requirements, such as the requirements for concrete or formwork, and the degree of coordination of various details, etc. There are also certain requirements. These problems need to be properly arranged before they can be directly adjusted Otherwise, there may be some problems during the construction process.

1. Requirements for concrete and formwork

 
01.

Concrete must be produced, conveyed or pumped to the flooring project site by commercial concrete production plants.

02.

Concrete specifications: C25~C30 concrete, the strength of which is not less than 25MPa in 28 days, according to the design requirements.

03.

Water-cement ratio: no more than 0.5, no water can be added during the feeding process.

04.

Cement: Use ordinary Portland cement with a grade of not less than 42.5.

 
05.

Aggregate: Well-graded aggregate should be used. Crushed granite or pebbles are used as coarse aggregate, and the maximum diameter is not more than 25mm. The fine aggregate is clean river sand with a fineness modulus of 2.4-2.7.

06.

Concrete mix ratio: the amount of cement is not less than 350Kg/m3. In order to avoid surface quality problems, the sand rate should be controlled at 35% to 40%.

07.

Concrete slump: 14±2cm, maximum 16cm.

08.

Setting time: The initial setting time should be controlled within 3-5 hours.

In order to avoid the excessive deviation of the surface elevation affecting the joints, the formwork should be steel formwork. The height of the formwork should be controlled within +0 and -2mm, and the steel formwork should be within 1-1.2 meters from the surrounding walls.

 

2. Construction corporation requirements

YZ40-4E 1
Construction technical requirements of concrete laser leveling machine 6
 

1. The concrete feeding speed should be determined according to the ground thickness and pouring area to determine the minimum hourly feeding speed. For a floor with a thickness of 200 mm, if the width of one-time pouring reaches 40 meters, the minimum feeding speed should reach 40 cubic meters per hour, otherwise there will be cold joint problems, which will affect the quality of ground construction.

YZ40-4E 2
Construction technical requirements of concrete laser leveling machine 7
 

2. Manually coordinate the concrete sent to the platform, and workers need to remove it as soon as possible and roughly level it. In addition, the area around the formwork, the wall, the column, the trench, the equipment foundation, the floor drain or the surrounding of the pipeline and other equipment that cannot be leveled requires manual cooperation for local leveling. Generally, 3-4 workers are required to cooperate with the construction (provided by Party A).

YZ40-4E 3
Construction technical requirements of concrete laser leveling machine 8
3. Other precautions In order to ensure the flatness of the ground, attention should be paid to:

1) The slump of concrete sent to the platform must be consistent each time.
2) Ensure that the concrete feeding speed reaches 40 cubic meters per hour or above, and the initial setting time of each batch of concrete must be consistent.
3) Ensure that the formwork elevation is accurate and cannot be disturbed during construction.
4) Environmental cooperation. The concrete floor that has just been constructed cannot be exposed to sunlight, wind, rain, etc. that are unfavorable to concrete health.

YZ40-4E03
Construction technical requirements of concrete laser leveling machine 9
4. Other requirements:

A. In order to avoid random cracks in the floor, the cutting time of shrinkage joints should be carried out as early as possible (within 24 hours).
B. At the same time as the construction of the laser leveling machine, there should be no electric welding machines on site, and no reflective objects (such as glass windows).
C. The foundation must reach a certain hardness to ensure that the laser leveling machine does not collapse when working on the ground.

D. The height of the ground in the factory building shall be calibrated by Party A, and the points must be evenly distributed, and there must be no error in the levelness.
E. Pouring concrete must be operated according to the requirements of Party B's technicians.

info-751-1256
Construction technical requirements of concrete laser leveling machine 10

Share this article

About the Author: Shandong Vanse Machinery Technology Co., Ltd.

Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.

Shandong Vanse Machinery

Leading manufacturer specializing in high-performance concrete laser screeds, telescopic arm flatwork handlers, and mechanical ride-on power trowels.

Post overview

Need Machine Guidance?

Speak directly with Shandong Vanse field specialists for tailored equipment quotes and site planning.

Contact Us Today

Related Articles

You Might Also Like