Concrete construction process and control program
The concrete construction process should be familiar to everyone.
In general, the concrete construction process is the preparation (production) of concrete–concrete transportation (transport)–concrete pouring (concrete)–concrete maintenance (conservation), In this chapter, we mainly share the three parts of the concrete pouring process, which is divided into the foundation concrete pouring construction process, the wall column concrete construction process.
And the beam and slab concrete construction process, so that everyone can understand the concrete parts of these important parts in detail. Pouring construction technology and process, in order to master the concrete construction rhythm in the actual concrete pouring process, so that the real-time control in the process, there are inspections and acceptances have been rectified, to ensure the concrete pouring molding effect and beauty, to achieve excellent quality!

Section 1: Foundation pouring construction technology
In the following chapters, we will introduce the concrete materials and the matters needing attention during transportation. This section will directly introduce the construction process of the foundation rafting. Before the official start, everyone can think about concrete construction from preparation to pouring. Complete, what preparations do we need, what conditions should be provided before pouring, what work needs to be done when pouring, what needs to be done after the pouring is completed, please remember one magic weapon, that is, the man-made method of the master key Ring", as long as the factors are sorted out in order from these factors, it will be ok, then take a look at the basic rafting construction process.
First of all, let's talk about the concrete project quality control program. The basic main line of each project is to use this control program. You can optimize this program according to your own project, better prepare for the event, process control, and follow-up afterwards. Perfect, better to improve the quality of cast-in-place concrete.
Section 2: Construction Deployment
The foundation concrete is made of commodity ready-mixed concrete. According to the construction process and construction schedule, the concrete pouring should be arranged as much as possible during the day. If the concrete pouring amount is large, the construction can be divided into two shifts if the construction can not be completed during the day and the construction joint cannot be left. Class 12h, relevant professional leaders and construction personnel follow the class operation, responsible for inspection, and at the same time do a good job in coordination. (There is no extension of the night construction to disturb the people)
Whether the foundation concrete is cast by the day pump or the ground pump is used together, and the specific conditions are determined according to the actual conditions of the project and the construction period requirements.
The contents of the construction preparation will be shared in the next article.
Share this article

About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Previous Post
Next Post
Related Articles