Whether need buy concrete laser leveling, this article share you
June 27, 2019

Concrete laser screed machine is based on modern industrial plant, large shopping malls, warehouses and other large areas of cement and concrete ground, such as the ground quality such as strength, flatness, level and other higher and higher demand for development, applied to large-area flooring construction, in the reduction of construction seams at the same time, can also effectively solve the ground air drum, shell, cracking, inequality. About the working principle of the laser leveling machine, it is not complicated to understand, simply is a laser emission laser as the reference plane, through the laser leveling machine laser receiver real-time control of the flathead, so as to achieve high-precision concrete, rapid flattening of the equipmen.
Advantage 1:
Save on human input. People who have done the grade level know that in a large area of flooring construction, the traditional process of manual construction, the number of team members from about 15 people, a single shift to complete the workload within 700㎡.
If using concrete laser screed machine, applied to large area floor ingress construction, the operation effect is greatly improved, 6 workers around the formation of the construction team, the average hour can complete 300m2 paving work, the average single shift can complete 2500 to 3500m2, especially suitable for the duration requirements of tight, large paving area, high quality requirements of the project.
Advantage 2:
Save capital investment and shorten construction cycle Traditional labor needs to advance the template, waste labor, delay the duration, can not effectively return funds. Concrete laser flatflating machine, high degree of automation, large area block one-time paving construction of the realization, so that the middle of the block does not need a module, in the reduction of branch templates, groove steel at the same time, but also further reduce the construction process, speed up the construction progress.
Advantage 3:
Very small leveling error The process principle of concrete laser flattening machine is to rely on gasoline generator power generation, electric drive laser measurement and control system, computer control system and servo drive system to complete the flat work by using the flathead, laser leveling machine to find flat does not need to pull the control line, also does not need the side template to control the ground elevation, and by the laser measurement and control system on the flat flating machine real-time control
As long as the laser transmitter is not disturbed, no matter where the leveling machine moves, it ensures that the elevation of the ground as a whole after the paving is not affected.
Advantage 4:
Better overallground on the ground
Traditional process construction, one day, one day pouring, can only a piece to jump open construction, the limitations are very large, can not be continuous operation, and the overall nature is not good, easy to cause the cumulative error of construction seams.
Concrete laser flatflating machine, applied to flooring construction, it is very easy to achieve a large area of flooring one-time overall paving, this paving technology can be based on the need for arbitrary block construction, continuous operation to the completion of the entire floor, so that the overall nature of the ground is better, which is the use of traditional construction technology can not be done.
Advantage 5:
The ground is more compact and uniform, reducing the cost of post-maintenance Laser flattener is using 4000 times per minute of high-frequency vibrators, the flat head vibrator yat-bar uniform high-frequency vibration, so that the concrete ground is dense and avoidthes the pressure concentration caused by deformation caused by ground cracking. Can reduce cracks, can effectively solve the ground air drum, shell, cracking, inequality, so that the floor of the late maintenance costs greatly reduced.

Thanks to All the Friends Who Support and Trust Shandong Vanse Machinery Technology Co., Ltd.
If you want to know more about Shandong Vanse Machinery Technology Co., Ltd. or have any questions, please feel free to contact us:
Our Factory
Shandong Vanse Machinery Technology Co., Ltd.
About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Shandong Vanse Machinery
Leading manufacturer specializing in high-performance concrete laser screeds, telescopic arm flatwork handlers, and mechanical ride-on power trowels.
Post overview
Main PRODUCT Categories
Need Machine Guidance?
Speak directly with Shandong Vanse field specialists for tailored equipment quotes and site planning.
Contact Us TodayRelated Articles
You Might Also Like
March 11, 2024
Large area concrete floor laser leveling machine one-time forming construction method
••▶•• Project Overview ••◀•• With the rapid development of the modern construction industry, the requirements for the flatness, levelness and aesthetics of large-area concrete floors are getting higher and higher. Traditional floor and floor construction methods often have problems such as long construction period and unstable quality. Therefore, the use of laser leveling machines for one-time construction of large-area concrete floors has become an efficient and high-quality choice. ••▶•• Construction preparation ••◀•• 1. Construction personnel training: Ensure that the operators are familiar with the operating principles and safety procedures of the laser leveler and have certain construction experience. 2. Equipment inspection: Conduct a comprehensive inspection of the laser leveling machine used in construction to ensure that it is in good working condition. 3. Preparation of construction materials: Select concrete materials that meet the requirements to ensure construction quality. 4. On-site survey: Conduct a detailed survey of the construction site to understand the terrain, climate and other conditions, and formulate corresponding construction plans. ••▶•• Construction process ••◀•• 1. Foundation treatment: Clean the construction site to ensure that the foundation is smooth and free of debris. If necessary, perform foundation leveling 2. Formwork support: According to the design requirements, support the formwork to ensure it is flat and stable. 3. Concrete pouring: Pour concrete evenly on the formwork according to the mix ratio required by the design. 4. Laser leveling: Immediately after the concrete is poured, use a laser leveling machine for leveling. Through the laser control system, it is ensured that the flatness and levelness of the ground meet the design requirements. 5. Surface treatment: Before the initial setting of concrete, use professional tools for surface treatment to eliminate defects such as bubbles and blisters on the surface. 6. Maintenance: After the concrete is finally set, perform timely maintenance to ensure the strength and beauty of the concrete. few, ••▶•• Construction Key Points ••◀•• 1. Ensure the flatness and stability of the formwork to avoid deformation or displacement during construction. 2. Control the pouring speed and amount of concrete to ensure that the concrete can be evenly distributed on the formwork. 3. When using the laser leveling machine, ensure the accuracy of the laser control system and adjust the equipment parameters in a timely manner to ensure the leveling effect. 4. During surface treatment, pay attention to the operating strength and speed to avoid damage to the concrete. 5. D uring the curing process, the moisture of the concrete surface should be maintained to prevent the concrete from drying out or cracking. ••▶•• Quality acceptance ••◀•• After the construction is completed, the quality inspection of the floor of the building will be carried out. Check whether the ground flatness, levelness, aesthetics and other indicators meet the design requirements. If problems are found, deal with them promptly. ••▶•• Conclusion ••◀•• The one-time construction method of laser levelinging for large-area concrete floors has the advantages of short construction period, stable quality, and high aesthetics. Through strict construction preparation and process control, it can be ensured that the construction quality meets the requirements. At the same time, it is necessary to pay attention to the key points of construction and quality acceptance links to ensure the smooth progress of the construction process and the final quality standards.Read More
May 12, 2025
How to inspect and accept the double-layer steel mesh after laying in the concrete pavement?
– Steel mesh surface: Observe whether there are obvious rust, oil stains, dirt and other pollutants on the surface of the steel mesh. If such conditions exist, it will affect the bonding between the steel bars and the concrete and needs to be cleaned. – Mesh flatness: Check whether the steel mesh is flat and whether there is warping or deformation. Observe with the naked eye or pull the wire to check. If the mesh is not flat, it may cause insufficient thickness of the local steel bar protective layer or uneven steel bar spacing during concrete pouring. – Cross-point binding: Check whether the steel bar intersection is firmly tied and whether the wire is loose or missing. It can be checked by manually pulling the steel bar intersection. For loose or missing parts, they should be re-tied in time. – Steel bar spacing: Use a steel tape measure to randomly select multiple parts to measure the spacing of steel bars, including the horizontal and longitudinal steel bar spacing of the same layer of steel mesh, and the spacing between the upper and lower layers of steel mesh. Check whether it meets the design requirements, and the allowable deviation is generally ±10mm. – Rebar position: Check whether the steel mesh is laid according to the design position, whether it deviates from the center line or exceeds the specified laying range. It can be determined by measuring the distance between the edge of the steel mesh and the control line drawn on the pavement base, and the deviation should be controlled within the allowable range. – Protective layer thickness: Use a steel bar protective layer thickness tester for detection, and measure at multiple points at different positions to ensure that the thickness of the concrete protective layer meets the design and specification requirements. Generally, the thickness of the steel bar protective layer of concrete pavement is between 30-50mm, and the allowable deviation is ±5mm. – Binding connection: For steel mesh connected by binding, check whether the number and spacing of binding points meet the requirements. Generally, the wire buckles of adjacent binding points are required to be in an eight-shaped shape to prevent the mesh from being skewed and deformed. At the same time, check the specifications and strength of the binding wire to ensure that it can withstand the tension during concrete pouring. – Welding connection: If welding connection is used, check the welding quality, including the length, height, and fullness of the weld. The weld surface should be smooth, without obvious defects such as pores, slag inclusions, cracks, etc. Use ultrasonic or radiographic testing methods to perform non-destructive testing on welds in important parts to ensure that the welding quality meets the requirements. – Material quality certification documents: Check the quality certificate, inspection report and other materials of the steel bars to ensure that the variety, specification, performance, etc. of the steel bars meet the design requirements. At the same time, check the qualification certificate of the steel mesh processing manufacturer to ensure that the product quality is traceable. – Construction records: Check the construction records of the laying of the steel mesh, including the cutting size, processing process, laying time, laying personnel and other information of the steel mesh, to ensure that the construction process has detailed records for quality traceability and problem analysis. – Concealed project acceptance records: Check whether the concealed project acceptance records are complete and whether the acceptance personnel have signed and confirmed. The records should record in detail the laying of the steel mesh, the inspection results, and the rectification of existing problems. During the inspection and acceptance process, if any problems are found, they should be recorded in time and the construction unit should be required to make rectifications. After the rectification is completed, acceptance will be carried out again until it meets the requirements. Only after acceptance can the next construction process be carried out. AMOUR JOINT CONCRETE LASER LEVELING MACHINE LIGHT TOWER POWER TROWEL STEEL FIBER TRACKED MINI DUMPERRead More
November 27, 2025
The entire process and key control points of the construction of the diamond sand wear-resistant floor
There are various methods for basement floor construction. Among them, the construction of diamond sand floor and diamond sand floor with curing agent is favored by many real estate projects due to its economic, wear-resistant, pressure-resistant, anti-pollution and easy-to-clean features. However, improper manufacturing processes can also lead to quality issues and potential risks. This article will respectively introduce the diamond sand wear-resistant floor from the perspective of technology and the prevention and control of common problems. 1. Diamond sand floor Compared with ordinary concrete floors, diamond sand floors have better wear resistance, compressive strength and impact resistance, and have a longer service life. However, from the perspective of microstructure, the surface of the diamond sand floor is relatively rough, and the capillary structure of concrete has a low resistance to the penetration, pollution and corrosion of substances such as acids, alkalis and oils. 2. Corundum + cured floor The construction of adding curing agent to the diamond sand floor. When the diamond sand floor is applied with a curing agent, it better makes up for the above deficiencies. Moreover, as the curing agent penetrates and forms a film, it enhances the integrity of the original surface, significantly improving its surface strength and wear resistance. After long-term use, it is obviously superior to the ordinary diamond sand floor in terms of cracking, powdering, and dusting, and is also easier to clean. It has extremely strong wear resistance, pressure resistance and impact resistance The diamond sand floor itself has excellent wear resistance. After adding a curing agent, the strength and hardness of the floor are further enhanced, and its wear resistance, pressure resistance and impact resistance are also significantly improved, and the durability of the floor is greatly enhanced. 2) Prevent sanding and dusting The main advantage of the diamond sand reinforced floor is its ability to prevent sanding and dusting. After the application of the curing agent, the surface hardness (indicated by the diameter of the indentation) and wear resistance (indicated by the length of the grinding pit) can be effectively enhanced. The surface becomes denser and has better integrity, which can effectively prevent sanding and dusting. 3) Waterproof, oil-proof and anti-corrosion The surface of a common diamond sand floor has pores that are hard to see with the naked eye. Water, oil and other corrosive liquids can seep into the interior of the floor through these holes and gaps. The most notable feature of the curing agent is its excellent sealing property, just like coating the floor with a film to prevent erosion. 1. The surface of the floor is firmly combined with the base layer, without any hollowing or sanding phenomena. 2. Surface layer quality: Uniform color, no obvious color difference, no scratches, no slag inclusions. The surface must not have cracks and hollowing is not allowed. 3. Gloss requirements: Achieve medium to high brightness, and the lamp should have a reflective effect when illuminated. 4. Joint: Uniform width, and the inside of the joint should be thoroughly cleaned. 5. The hardness of the floor should reach above 6.5 on the Mohs scale (tested by a hardness tester). 6. The trachoma rate shall not exceed 3 per square meter. 1. The strength of the concrete shall not be lower than C25. 2. The smallest possible water-cement ratio. A water-cement ratio that is too high can cause bleeding on the concrete surface and reduce the compressive strength of the concrete surface. Therefore, the water-cement ratio should be as small as possible, generally controlled below 0.5. 3. Commercial concrete should be used as much as possible. If on-site mixed concrete is used, its slump should be controlled at 1 to 3cm. The slump of commercial concrete is between 12 and 14cm. The diameter of the larger crushed stones shall not exceed 30mm. 4. When the concrete thickness is greater than 8cm, ordinary concrete should be used for pouring; when the concrete thickness is less than 8cm, fine aggregate concrete should be used for pouring. 5. Concrete should be leveled immediately after pouring, with a flatness of no more than 2mm within a 2-meter range. 6. Before the surface layer construction, the base concrete and vibration slurry should be sufficient (not less than 5mm). 7. The mud content of sand and gravel in concrete shall not exceed 2%. 8. After vibration grouting, the bleeding of the concrete should be uniform. If there are water pits, they must be removed and the surface leveled again; otherwise, the flatness of the diamond sand floor construction cannot be guaranteed. 1. Construction of diamond sand floor 1) The ground concrete is poured in sections and leveled immediately after pouring. When multiple locations are being poured simultaneously, pay attention to the construction sequence being carried out in one direction and consider the consistency of the mating surfaces. ② Concrete should be leveled with a long roller or a long straightedge after being pushed flat. Three to five hours after the concrete is poured, it should be observed that there is no bleeding on the surface and it has reached the initial setting state. 2) Use a mechanical trowel to tap the slurry in a round motion. For fine areas, use a wooden trowel to trim the edges. The main purpose is to smooth the concrete surface and reduce the floating slurry. Pay attention to troweling in the same direction as pouring. 3) Sprinkle the wear-resistant aggregate in two batches. In the first batch, evenly spread two-thirds of the wear-resistant material on the already troweled cement floor. 4) For the second time, evenly spread the remaining 1/3 of the wear-resistant material on the surface of the concrete, and use a mechanical trowel with a disc installed to work crisscross and cross at least twice. 5) Use a mechanical trowel (metal disc) to smooth it out multiple times back and forth. For the fine corners and edges, use a manual trowel in coordination with the construction. The time for the next process should be determined based on the temperature and humidity. 6) When the surface of the floor begins to harden, use a mechanical trowel with a metal blade to grind and smooth it, and repeat this operation 3 to 4 times. (Construction workers must wear soft flat shoes to avoid damaging the surface. The fine corners and edges should be polished by hand.) 7) Water curing should be carried out on the polished wear-resistant floor (mainly to prevent the evaporation of surface moisture and ensure the stable growth of the wear-resistant material's strength). The curing period is 7 days. 8) After the surface has cured for a certain period of time (5 to 6 hours after the completion of the wear-resistant material floor), use a mechanical trowel equipped with a metal blade for the final polishing and leveling. 9) Mold and compartment cutting (this can be done according to the actual situation on site and the owner's needs). Mold removal can be carried out the day after the completion of the diamond sand floor. During the operation, be careful not to damage the edge of the floor. The size of the compartments shall be determined by Party A on the third day after the completion of the diamond sand floor. 2. Application of penetrating liquid hardener (commonly known as curing agent) The original color of the diamond sand floor should be cured for more than 14 days, while the colored diamond sand floor usually needs to be cured for 28 days. Only after the color has matured can the penetrating liquid hardener be applied. The specific measures are as follows: Before construction, clean and remove debris, oil stains, paints, curing agents, etc. from the ground. If there are any pits or cracks, they should be repaired in advance with cement-based jointing mortar and maintained for 3 days. If no repair is needed, proceed with the construction directly. 2) Sprinkle water on the base layer until it is fully moistened. Do not sprinkle too much. 3) Use a 50-mesh resin grinding disc to grind the base layer, removing the floating slurry and stains on the base layer to make it free of roughness and gradually smooth. 4) After the 50-mesh grinding is completed, use a 150-mesh resin grinding disc for grinding. After grinding, use a high-power vacuum cleaner to suck up the mud and sewage on the surface of the base layer. 5) Sprinkle water on the surface of the base layer and grind it with a 300-mesh resin grinding disc (the ground should be ground evenly in a grid pattern, and the machine's pushing speed should be one step per second to grind off the remaining materials and fine scratches on the ground). After grinding, grind it with a 500-mesh grinding disc. Then, use a vacuum cleaner to suck up the wastewater and ventilate to dry the base layer. 6) After the base layer is dry, if the surface turns slightly white, apply the concrete sealant and hardener. Sprinkle the material evenly and spread it evenly with a mop. Keep the base layer surface moist for 30 minutes. If there is rapid penetration in some areas and it has dried, sprinkle the material again and use a mop to evenly moisten the base layer. 7) After 30 minutes, the surface of the concrete sealant and hardener begins to thicken. Water should be sprinkled on its surface and pushed back and forth with a long-bristled brush or floor scrubber to dilute the excess hardener and better penetrate into the base layer. After one hour, the excess material and water should be sucked dry with a vacuum cleaner to ensure that the base layer is dry for more than 12 hours. 8) After 12 hours, sprinkle water on the base surface of the completed construction material, and grind it with a 500-mesh resin grinding disc to remove the excess material. Then, grind it with a 1000-mesh grinding process. After grinding, use a vacuum cleaner to suck up the wastewater. 9) After 12 hours, the base layer has basically dried. Then, it is ground and polished with a 2000-mesh resin grinding disc to gradually give its surface a lustrous appearance. 10) For each mesh size, the grinding discs should be cross-ground 3 to 5 times in both the longitudinal and transverse directions. 11) Special treatment ① Corner and edge treatment: Large machinery can only be used for large-scale grinding. For corner and edge positions, a portable Angle grinder should be used for grinding and polishing, following the same method as for large-scale construction. When the base layer has poor strength and severe sanding, it is necessary to reinforce the base layer first, and then proceed with the normal construction process. First, use a 300-mesh resin grinding disc to remove the floating slurry on the surface of the base layer. Then, evenly sprinkle the concrete sealant and hardener to ensure it fully wets and penetrates into the base layer. After 12 hours, when the concrete sealant and hardener has cured and the strength of the base layer has improved, follow the normal process: 50-mesh grinding (water grinding) → 150-mesh grinding (water grinding) → 300-mesh grinding (water grinding) → construction materials → 12-hour drying and curing → 500-mesh grinding (water grinding) → 1000-mesh grinding (water grinding) → 2000-mesh grinding (dry grinding). The aesthetic effect of the floor cannot be achieved without meticulous control during the construction process. Besides strictly adhering to the corresponding techniques and methods, the prevention of common quality problems also requires attention. If the construction is not done properly, many problems will occur during later use. Now let's talk about the common quality problems of the diamond sand wear-resistant floor and how to prevent them. There are mainly three reasons for the color difference of corundum: 1) Material selection issues; 2) The materials were not spread in several portions, the amount of materials used was insufficient, and the thickness was uneven. 3) Maintenance issues: The use of covering with plastic film for maintenance led to uneven evaporation of ground moisture. The area where the film comes into contact with the floor is whitish, while the area where it does not touch the floor is normal in color. Preventive measures Choose a manufacturer with stable and reliable product quality and a good reputation. 2) The spreading of materials should be carried out strictly in accordance with the requirements of the briefing in several portions, with a usage of no less than 5kg/m². 3) Plastic film curing is strictly prohibited. During summer construction, water spraying curing can be adopted in several batches (with an interval of 2 to 3 hours). The allowable deviation of ground flatness is ≤2.5mm/2m in both longitudinal and transverse directions. The reasons for the deviation during construction are: 1) The template setup is out of tolerance; 2) The concrete part was not leveled in accordance with the standard. 3) The wear-resistant material is not evenly spread. Preventive measures 1) Strictly calibrate the elevation lines. Set up steel rods every 2 meters or so. The elevation of the steel rods should be the same as that on the longitudinal seam formwork. Check with a level. 2) The joints should be roughened and leveled in advance. When pouring new concrete, the levelness should be consistent with that of the already poured ground. Any low-lying areas should be replenished and filled in a timely manner. 3) Wear-resistant aggregates should be spread in two portions. The first dosage should be two-thirds of the total dosage. Ensure that the mixture falls evenly. Do not throw it forcefully to avoid the separation of aggregates and cement. After the wear-resistant material has absorbed a certain amount of moisture, it is ground and dispersed with a grinding machine and then combined with the base concrete slurry. For the second spreading, apply the remaining one-third in a direction perpendicular to that of the first spreading. When spreading, first use a straightedge or a straight scraper to measure the levelness, and adjust the uneven areas of the first spreading. After spreading, immediately smooth and polish it, and repeat the grinding machine operation at least twice. When the grinding machine is in operation, it should be carried out alternately in the longitudinal and transverse directions, evenly and orderly, to prevent material accumulation. The third time mainly involves repair treatment. For low-lying areas, materials are replenished and leveled. For corners and edges that cannot be covered by the grinding machine, manual flattening and smoothing are adopted. There are the following situations regarding ground cracks: If the initial setting time of concrete is not well controlled and the diamond sand wear-resistant aggregate is scattered when the moisture content of the concrete is relatively low, it is easy to cause cracks after the construction is completed. 2) Improper construction methods, insufficient thickness of the wear-resistant layer (corundum layer), rapid water loss (such as excessive construction environment atmosphere, etc.), resulting in volume shrinkage and linear shrinkage, causing cracks or hollowing. 3) Improper maintenance: After the completion of construction, the ground was not maintained within the prescribed time or was not adequately watered for maintenance. When the concrete temperature is relatively high, pouring cold water for curing can also cause cracks. Note: When using only the diamond sand floor, it is recommended to use a maintenance agent (oily and film-forming effect) to maintain the floor. If the corundum is reinforced (or epoxy), water curing can be directly adopted. 4) The contraction joint was cut late, and cracks appeared due to thermal expansion and contraction. Under normal circumstances, it is advisable to cut the expansion joints 24 to 48 hours after the completion of the construction of the corundum floor. If it is too late, as the hardness of the floor gradually increases, the floor is prone to "cracking" and developing cracks during the cutting process. 5) If the spacing of the division joints is too large, cracks may also occur. Preventive measures 1) Strictly control the time of the first sprinkling of materials; 2) The concrete layer and the wear-resistant layer (corundum) are constructed simultaneously. 3) The curing time shall be no less than 14 days; 4) Reasonably control the cutting time; The spacing of the division joints should generally not exceed 6m*6m. Cause of formation 1) The roughening and polishing processes are rough. 2) Inadequate maintenance and insufficient maintenance time; 3) The spreading time of wear-resistant aggregates is not well controlled. Preventive measures 1) Use a grinding machine to thoroughly smooth, compact and roughen the ground for no less than three times, and use a floor trowel to thoroughly smooth and level the ground for no less than three times. 2) The curing time shall be no less than 14 days; 3) Strictly control the spreading time of wear-resistant materials. The timing of spreading wear-resistant materials varies as needed, depending on factors such as climate, temperature, and concrete mix ratio. Spreading too early will cause the wear-resistant material to sink into the concrete and lose its effect. If it is spread too late, the concrete will gradually lose its adhesive force due to solidification, preventing the wear-resistant material from fully bonding with it. The most convenient way to determine the time for spreading wear-resistant materials is to let your feet sink about 5mm when stepping on the ground, and then you can start the first spreading work. The moisture at the edges of walls, columns, doors and formwork disappears more quickly. It is advisable to prioritize the application of water to prevent the effect from being reduced due to water loss. 1. Local damage: Clean the damaged area thoroughly, soak it in water to moisten it, then repair it with a putty made of styrene-butadiene latex mixed with water and a hardener material that has screened out the aggregates. Finally, apply the styrene-butadiene latex mixed with water emulsion. 2. Large-scale damage: According to actual needs, lines can be drawn and sawn on the damaged area, the surface layer and part of the base layer can be chiseled off, then the area can be cleaned and moistened, the plain cement slurry can be swept, concrete can be poured, and finally the surface layer of the diamond sand hardener can be applied. 3. Floor peeling: The surface of the wear-resistant diamond sand floor curls and peels. Remedial measures: Cut and chisel off the peeling area (chiseling it into a pitted surface), spray water on the pitted area to moisten it, then apply repair mortar of the same grade as the concrete and press it down to level the ground. Finally, apply a curing agent. 4. Remedial measures for cracks in diamond sand floor: 1) Cracks in areas with requirements for anti-seepage, impact resistance and wear resistance on the surface should undergo surface treatment. 2) For cracks that can affect the integrity, strength, impermeability and steel bar corrosion of the structure, grouting treatment should be carried out. 3) For cracks that endanger the safe operation of buildings, in addition to grouting treatment, other reinforcement measures should also be taken when necessary. 4) Cracks that are sensitive to temperature should be treated when the crack opening is relatively large in the later stage of the low-temperature season. 5) Flexible materials must be used to treat active cracks. Note: The parameters provided in this document are for reference only and are not mandatory. Due to differences in technical characteristics between different brands and models of laser levelers, please consult the manufacturer for a suitable solution before actual operation. This reference document assumes no responsibility for any issues arising from failure to follow the manufacturer's instructions.Read More