When there are bubbles on the concrete surface, in addition to the method of adjusting the operating parameters of the trowel machine mentioned above, further adjustments can be made from the following aspects
Increase the number of trowel passes
Appropriately increase the number of trowel passes of the trowel machine, so that the blade squeezes and presses the concrete surface multiple times, which helps to further squeeze out the bubbles inside the concrete and make the concrete surface more compact and smooth. However, attention should be paid to the time interval between each trowel. It is not advisable to perform the next trowel before the concrete reaches a certain strength, so as not to damage the concrete structure. Generally speaking, it is more appropriate to perform 2-3 trowels after the initial setting of the concrete and before the final setting.
Adjust the pressure of the trowel machine
The pressure of the trowel machine on the concrete surface can be appropriately reduced. If the pressure of the trowel machine is too high, a harder "shell" will form on the concrete surface, which is not conducive to the discharge of bubbles, but may seal the bubbles inside the concrete. By adjusting the counterweight or hydraulic system of the trowel machine, the trowel machine can apply a more appropriate pressure to the concrete surface during operation, so that bubbles can escape the surface more easily. The specific pressure adjustment value needs to be tested and explored according to the state of the concrete and the situation of bubbles.
In the process of adjusting the operating parameters of the trowel machine, it is necessary to closely observe the changes on the concrete surface and make fine adjustments to the parameters in time according to the actual effect to achieve the best trowel effect and eliminate bubbles on the concrete surface. At the same time, it is also possible to combine measures such as optimizing the concrete mix ratio and improving the pouring process to fundamentally reduce the generation of bubbles on the concrete surface.
Thanks to All the Friends Who Support and Trust Shandong Vanse Machinery Technology Co., Ltd.
If you want to know more about Shandong Vanse Machinery Technology Co., Ltd. or have any questions, please feel free to contact us:
Our Factory
Shandong Vanse Machinery Technology Co., Ltd.
About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Shandong Vanse Machinery
Leading manufacturer specializing in high-performance concrete laser screeds, telescopic arm flatwork handlers, and mechanical ride-on power trowels.
Post overview
Main PRODUCT Categories
Need Machine Guidance?
Speak directly with Shandong Vanse field specialists for tailored equipment quotes and site planning.
Contact Us TodayRelated Articles
You Might Also Like
October 31, 2023
How maintainable is a concrete laser leveling machine?
Concrete laser leveling machine maintainability With the rapid development of the construction industry, concrete laser leveling machines, as an efficient and accurate concrete construction equipment, are widely used in various construction projects. However, in order to ensure the long-term stable operation of the equipment, reduce the failure rate, and improve production efficiency, research on the maintainability of concrete laser leveling machines is crucial. This article will take an in-depth look at concrete laser leveling serviceability and its impact on equipment performance. ◆Working principle and composition of concrete laser leveling machine Concrete laser leveling machines mainly work based on a combination of laser technology and scraping machinery. It generates a laser beam through a laser transmitter and receives and calibrates it through a receiver. The leveling head is responsible for reflecting the laser beam onto the work surface and smoothing the concrete surface. In addition, the equipment is equipped with support wheels and steering wheels to ensure operational stability and flexibility. ◆The importance of maintainability Maintainability refers to the nature of equipment that can be easily repaired and maintained during operation. Good maintainability can improve the operating efficiency of equipment, reduce failure rates, and reduce downtime, thereby saving costs for enterprises and improving production efficiency. In addition, for equipment that operates continuously for a long time, such as concrete laser levelings, good maintainability is the key to ensuring stable operation of the equipment. ◆Maintainability design of concrete laser leveling machine In order to improve the maintainability of concrete laser leveling machines, designers need to consider the following aspects: ★Modular design: The main components of the equipment are designed into modules, which can be easily replaced and repaired. For example, components such as the leveling head, support wheels and steering wheels can be designed as modules and can be quickly replaced in the event of failure. ★Easy disassembly design: Designers should consider the ease of disassembly and assembly of the equipment. For example, standardized connection methods should be used at the connections between the main components of the equipment to facilitate disassembly and assembly. ★Lubrication and maintenance design: The moving parts of the equipment should be lubricated and maintained regularly to reduce wear and tear. Designers should consider the lubrication and maintenance cycles of the equipment, as well as the methods and tools for lubrication and maintenance. ★Dust-proof and waterproof design: Concrete laser levelingers often face dust and water environments when working on construction sites. Designers should consider dustproof and waterproof designs for equipment to extend the service life of the equipment. ★Fault prompt design: The equipment should have a fault prompt function. When the equipment fails, the operator can detect it in time and take corresponding measures. ◆M aintenance practices and recommendations for concrete laser leveling machines In actual use, in order to improve the maintainability of the concrete laser leveling, operators need to comply with the following recommendations: ★Regular inspection: Operators should regularly check the wear and tear of various parts of the equipment, especially the moving parts. If parts are found to be severely worn or damaged, they should be replaced in time. ★Keep it clean: The concrete laser leveling machine should be kept clean to prevent dust and debris from entering the inside of the equipment. During operation, avoid dropping debris into the equipment. ★Regular lubrication: The moving parts of the equipment should be lubricated and maintained regularly. Operators should regularly add lubricating oil or grease to the equipment according to the equipment's lubrication and maintenance requirements. ★Moisture-proof and rust-proof: The concrete laser leveling machine should be placed in a dry environment to avoid moisture and rust. After working in a humid environment, water stains and rust on the surface of the equipment should be cleaned in time. ★Back up wearing parts: For some wearing parts, such as scrapers, bearings, etc., some spare parts should be backed up so that they can be replaced in time w hen needed. ★Train operators: Operators should undergo professional training and be familiar with the structure, performance and working principles of the equipment. During the operation, the operating procedures should be strictly followed to avoid damage to the equipment caused by misoperation. ★Establish maintenance files: For each concrete laser leveling machine, a complete maintenance file should be established to record equipment repair records, maintenance records and replacement parts records, etc. Through the establishment of maintenance files, we can better understand the operating status and maintenance status of the equipment, and provide a basis for equipment repair and maintenance. ★Introducing condition monitoring technology: By introducing condition monitoring technology such as vibration monitoring, temperature monitoring, etc., the operating status of the concrete laser leveling can be monitored in real time to detect abnormal situations in a timely manner and take corresponding measures to avoid the expansion of faults, thereby reducing maintenance costs and improving production efficiency. ★Reasonably arrange maintenance plans: Reasonably arrange maintenance plans based on the operating status and maintenance experience of the equipment to avoid excessive maintenance or insufficient maintenance, reduce equipment failure rates and repair costs, and improve equipment maintainability. ★Establish an expert support system: By establishing an expert support system, we provide technical support to operators and maintenance personnel to solve the problems they encounter at work, improve the efficiency and accuracy of problem solving, and thereby improve the maintainability of the equipment. In short, good maintainability is one of the key factors to ensure the long-term stable operation of the concrete laser leveling. Through reasonable design and scientific management, the maintainability of the equipment can be improved, maintenance costs can be reduced, production efficiency can be improved, and more value can be created for the enterprise.Read More
January 15, 2025
How to ensure stable construction quality when using laser leveling machine to level large-area floor concrete?
– Before construction, the site should be thoroughly cleaned to remove debris, garbage and loose parts of the original ground. For example, for the renovation project of old factory buildings, all oil stains and broken concrete blocks on the ground need to be cleaned up. For the base, if there is any unevenness, it needs to be repaired and compacted. If the base is a soil foundation, it should be layered and rolled according to the design requirements to make its compaction degree reach more than 90%, providing a solid foundation for concrete pouring. – At the same time, the drainage slope should be set. According to the purpose of the site and the design requirements, the general drainage slope is not less than 0.3% – 0.5%. Through precise measurement and layout, determine the drainage direction and slope control points to ensure smooth drainage and avoid water accumulation affecting the quality of the floor. – Select qualified concrete raw materials, including cement, sand and gravel, admixtures, etc. Cement should be selected with strength grades that meet the design requirements, such as ordinary Portland cement P.O42.5 or P.O52.5, and the stability and setting time of cement should be checked. The particle size and mud content of sand and gravel should meet the specifications. For example, the maximum particle size of coarse aggregate should not be greater than 31.5mm, and the mud content should not exceed 1%; the mud content of fine aggregate should not exceed 3%. – Strictly design and test the concrete mix ratio. According to the use function of the floor (such as heavy-duty industrial floor, ordinary warehouse floor, etc.), strength requirements and construction environment, the best mix ratio is determined through laboratory trial mixing. During the construction process, concrete mixing should be carried out strictly according to the mix ratio, and the performance indicators such as slump of concrete should be tested regularly. The slump is generally controlled between 120-180mm to ensure good working performance of concrete. – Before construction, fully commission the concrete laser leveling machine. Check the operating status of the engine or motor to ensure the normal operation of the power system. For example, the engine should start quickly, run smoothly, and have no abnormal noise and shaking. For the laser system, it is necessary to perform precise calibration and adjust the height and angle of the laser transmitter so that the laser plane it emits is consistent with the design elevation of the floor. – Calibrate the scraper, vibrator and other working parts of the leveler. The flatness error of the scraper should be controlled within ±1mm, and the frequency and amplitude of the vibrator should be adjusted according to factors such as the slump and thickness of the concrete. Generally, the vibration frequency is between 3000-5000 times/minute, and the amplitude is between 3-5mm to ensure that the concrete can be fully vibrated and leveled. – Use appropriate concrete pouring methods, such as pumping or self-unloading. During the pouring process, the pouring speed and height should be controlled to avoid segregation of concrete. For example, when pumping concrete, the discharge port height should not exceed 1.5m, and the concrete should be evenly distributed on the site. – Use the spreading function of the laser leveler or cooperate with other spreading equipment to spread the concrete evenly on the site. The thickness of the material should be slightly higher than the design elevation, generally 10-20mm higher, to leave a margin for the leveling work. During the material laying process, care should be taken to avoid the accumulation of concrete in one place, resulting in excessive local thickness. – When operating the laser leveling machine, the equipment should be kept moving at a uniform speed, and the speed is generally controlled between 1-2m/min. The operator should adjust the scraper height and vibration frequency of the leveling machine in time according to the laser signal and the automatic leveling function of the equipment. For example, when the laser receiver detects that the ground is higher than the design elevation, the leveling machine automatically adjusts the scraper to descend and scrapes off excess concrete; when it is lower than the design elevation, the scraper rises, and the vibrator strengthens the vibration to fill the low-lying area with concrete. – During the leveling process, attention should be paid to the connection of adjacent construction areas. The leveling work of adjacent areas should be completed before the initial setting of the concrete, and the flatness and density of the connection should be guaranteed. Generally, the overlapping construction method is adopted, and the overlapping width is between 10-20cm to ensure the flatness and integrity of the entire floor. – Professional quality inspection personnel are equipped to check the flatness, density and elevation of the floor in real time during the construction process. Use tools such as level, 2m ruler and feeler gauge for inspection. For example, for each construction area (such as 100-200 square meters), use 2m ruler and feeler gauge to check the flatness, and the flatness error should be controlled within ±3mm; use level to check the elevation, and the elevation error should be controlled within ±5mm. – For parts that do not meet the quality requirements, timely adjustments and repairs should be made. If it is found that the local flatness exceeds the tolerance, it can be repaired by using a small leveling tool or manual smoothing method; for areas with insufficient density, use a flat vibrator to vibrate again or an inserted vibrator to supplement the vibration. – After the concrete is leveled, the finishing treatment is carried out according to the use requirements of the floor. If it is an industrial floor that requires wear resistance, mechanical smoothing and manual fine smoothing can be carried out after the initial setting of the concrete. Mechanical troweling generally uses a driving trowel, and the number of troweling passes is not less than 3 times, so that the floor surface reaches a certain gloss and hardness. – After finishing, timely maintenance should be carried out. You can use methods such as covering with plastic film, straw mats or spraying curing agents. The curing time is determined according to factors such as the type of concrete and the ambient temperature, and is generally not less than 7-14 days. During the curing period, the concrete surface should be kept moist to avoid cracks in the concrete due to water loss. – During the curing period, the floor should be protected as a finished product, and warning signs should be set up to prevent people and vehicles from walking or working on the floor that does not meet the strength requirements. For example, for heavy-duty industrial floors, heavy vehicles are strictly prohibited from passing when the concrete strength does not reach more than 70% of the design strength. – After the curing period, quality acceptance is carried out in accordance with design requirements and relevant standards. The acceptance content includes indicators such as the flatness, strength, and thickness of the floor. For example, the thickness and strength of the floor can be tested by core sampling, and the strength should reach the designed strength level; a laser flatness meter is used to test the flatness of the entire floor to ensure that the flatness of large-area floors meets quality requirements.Read More
November 4, 2025
Safety techniques and precautions for operating a power trowel in a sloping (uphill or downhill) environment
Operating a power trowel on slopes, especially those with initially set concrete, is one of the most risky and technically challenging conditions in ground construction. The following safety techniques and precautions must be strictly observed to prevent serious accidents. Operating a power trowel on a slope mainly involves two major risks: Risk of equipment loss of control: The polishing machine is very heavy and is prone to sliding, side-sliding or rolling under the effect of gravity, which may injure the operator or damage the equipment. Risk of personnel falling: Operators walking on inclined and smooth concrete surfaces are highly prone to slipping and may be seriously injured by the high-speed rotating polishing discs. All operators and auxiliary workers must be clear about the construction plan, slope, range and emergency response plan. Clearly demarcate the operation area and set up clear warning signs. Comprehensive inspection: Ensure that the power trowel (especially the hydraulically driven type) is in good condition and that the braking system (if available) is sensitive and reliable. Check the wear of the power trowel and use a power trowel with uniform wear. Anti-slip rubber shoes: It is necessary to wear anti-slip water shoes or rubber shoes with deep toothed soles that can firmly adhere to the concrete surface. Flat shoes or old shoes are strictly prohibited. Safety rope/safety belt (for steep slopes) : When the slope is large (usually recommended to exceed 15°) or the working conditions are particularly dangerous, the operator should wear a safety rope and fix it to a firm anchor point at the top of the slope, and be supervised by a dedicated person. Other equipment: Work clothes and gloves. Loose clothing is strictly prohibited to prevent being drawn in by rotating parts. Reserve sufficient safety areas at the top and bottom of the slope and remove all obstacles. Make sure there are no debris, steel bars, etc. on the slope. Prepare sufficient lighting, especially when there is insufficient light. Basic principle: Relatively safe, but control the speed and Angle well. Technical essentials Keep the machine upright: Position the machine directly towards the top of the slope and do not drive diagonally. Steady and slow upward movement: Use a low gear and a stable throttle to maintain a steady forward speed. Utilizing the machine's own weight: Moving the center of gravity of the machine backward can provide better adhesion. However, always be vigilant to prevent the machine from suddenly shutting down and sliding back due to insufficient power or slippage. Basic principle: The highest risk! Extreme caution must be exercised. Technical essentials Always keep the machine facing the downhill direction. It is strictly forbidden to go downhill horizontally or diagonally. Utilize gravity and braking: Let the machine move slowly down relying on gravity, and control it with a low gear and intermittent braking (if there is a braking function) to achieve the effect of "engine braking". Do not coast with the engine off: The engine power must be maintained to provide hydraulic and braking assistance. Center of gravity control: The operator should stand on the uphill side of the machine, use their own body as a counterweight, and be ready to jump upward to the side at any time when the machine loses control. Try to avoid moving sideways or making U-turns on slopes. If you need to change direction, you should try to do it in a pre-leveled and relatively flat area (such as a rest platform). It is strictly forbidden to make sharp turns on slopes, as this can easily cause the machine to tip over. When the machine slides down, it is strictly forbidden to block it with your feet or hands! This can lead to serious crush injuries. The correct approach is to quickly release the control lever (to stop the rotation of the power trowel) and jump to the uphill side to clear the machine's descent path. If you slip, stay away from the machine immediately! Curl up your body and roll upwards to the side, away from the rotating power trowel disc of the power trowel. The operator must remain fully concentrated throughout the process, always being aware of the machine's condition and the road surface beneath their feet. Maintain effective communication with the auxiliary personnel at the top and bottom of the slope (such as using walkie-talkies or gestures) to ensure they are not on the potential out-of-control path of the machine. The operation of the machine can only be carried out after the concrete has reached sufficient initial setting strength (the depth of the footprints left by people when stepping on it does not exceed 5mm). When the strength is insufficient, the equipment will sink and damage the concrete structure. Pay attention to the moisture on the surface of the concrete. If there is excessive bleeding, the surface will become abnormally slippery, significantly increasing the risk of personnel and equipment slipping. A dedicated person must be assigned to a safe location for supervision, always ready to cut off the power supply or provide assistance in case of an accident. Cables or hydraulic hoses must be led down from the top of the slope and someone should be responsible for organizing them to prevent them from being crushed or entangled by machinery. Check the equipment, modify anti-slip measures, and ensure personal protection at home. The key is to go uphill steadily and downhill slowly, and to face the right direction. Avoid turning sideways and making a U-turn. Make an emergency jump to ensure safety. The strength of the concrete must be sufficient and team communication must not be interrupted. For projects with extremely steep slopes or particularly complex working conditions, it is strongly recommended to seek an experienced professional team or consider using a remote-controlled power trowel to completely eliminate personnel safety risks. Safety always comes first. Never take chances. Note: The parameters provided in this document are for reference only and are not mandatory. Due to differences in technical characteristics between different brands and models of laser levelers, please consult the manufacturer for a suitable solution before actual operation. This reference document assumes no responsibility for any issues arising from failure to follow the manufacturer's instructions.Read More