Technological innovation plays a vital role in improving the construction efficiency of concrete laser leveling machines. The following are some technological innovation directions that can be considered to improve construction efficiency and equipment performance:
1. Automation and intelligence:
The introduction of automation and intelligent technologies, such as unmanned driving technology, can realize automated operation, reduce manpower requirements, and improve operation speed and accuracy.
2. High-precision measurement technology:
The application of high-precision measurement technology, such as laser measurement and control system, can monitor and control the construction process in real time to ensure that each construction link meets the design requirements and quality standards.
3. Internet of Things Technology:
The use of Internet of Things technology to achieve interconnection between equipment, remote monitoring and management of construction equipment, and improve equipment utilization and maintenance efficiency.
4. New material application:
The use of new materials, such as high-performance concrete, can improve construction quality and reduce resource waste.
5. Energy-saving technology and renewable energy:
The use of energy-saving technology and renewable energy can reduce energy consumption during construction.
6. Drone technology:
Use drones for high-altitude surveys and monitoring to obtain accurate terrain and building information and improve logistics efficiency and accuracy.
7. BIM (Building Information Modeling) Technology:
BIM technology can realize digital simulation of the entire life cycle of a building, conduct precise planning and design optimization before construction, and reduce changes and adjustments during construction.
8. Artificial Intelligence Monitoring:
Use artificial intelligence to monitor various parameters in the construction process in real time, find problems in time and issue warnings to ensure construction safety and quality.
9. Equipment Monitoring and Maintenance:
Through sensors and control systems, equipment can be monitored and maintained in real time, which reduces the occurrence of failures and improves equipment stability.
10. Construction Planning and Layout Optimization:
Through reasonable construction planning and layout, the waste of land and water resources can be reduced and the project cost can be reduced.
Through these technological innovations, the construction efficiency of concrete laser leveling machines can be significantly improved, construction costs can be reduced, and project quality can be improved.
Thanks to All the Friends Who Support and Trust Shandong Vanse Machinery Technology Co., Ltd.
If you want to know more about Shandong Vanse Machinery Technology Co., Ltd. or have any questions, please feel free to contact us:
Our Factory
Shandong Vanse Machinery Technology Co., Ltd.
About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Shandong Vanse Machinery
Leading manufacturer specializing in high-performance concrete laser screeds, telescopic arm flatwork handlers, and mechanical ride-on power trowels.
Post overview
Main PRODUCT Categories
Need Machine Guidance?
Speak directly with Shandong Vanse field specialists for tailored equipment quotes and site planning.
Contact Us TodayRelated Articles
You Might Also Like
August 25, 2025
How to maintain the hydraulic system of concrete laser leveling machine
This is the most basic and crucial step, enabling early detection of potential problems. Visual Inspection: Lake Check: Carefully inspect all hydraulic hoses, joints, cylinders, valve blocks, and hydraulic pump/motor surfaces for oil stains. Any leaks, even minor ones, must be addressed immediately. Oil Level Check: With the machine parked on a level surface and the hydraulic cylinders in their original positions, check the oil level gauge on the hydraulic oil tank. The oil level should remain between the upper and lower marks on the dipstick. A low oil level can cause the pump to suffocate, seriously damaging it; an excessively high oil level can cause the oil temperature to rise abnormally. Oil Temperature Check: After a period of operation, feel the oil tank wall to feel its temperature. Normal oil temperatures are generally between 30-60°C. If the oil temperature is too hot (over 70-80°C), the system is overheating and requires shutdown and inspection. Cleanliness Check: Inspect the area around the oil tank filler neck and the breather (air filter) for dust and debris to ensure they are clean. Audory Check: When starting the machine and operating hydraulic mechanisms, listen carefully for unusual noises from the hydraulic pump, such as clicking (cavitation) or high-frequency hissing. Unusual noises often indicate pump damage or cavitation. Operational Feel Check: Operate the various handles to feel the smooth and powerful movements of the screed, including lifting, traveling, and so on. Check for any sluggishness, weakness, jerking, or crawling. Please refer to the specified maintenance schedule in your equipment's Operation and Maintenance Manual. The following are general recommendations. Maintenance Items Recommended Maintenance Cycles Detailed Instructions and Precautions Replace hydraulic oil First Maintenance: 500 hours Subsequent Maintenance: Every 2000 hours or annually (whichever comes first) Important! New oil does not equal clean oil. Keep the oil clean. 1. Drain the oil while it's hot: After operation, drain the old oil immediately while it's still hot. 2. Clean the oil tank: Thoroughly clean the inside of the tank, the magnetic rod, and the baffles with a clean silk cloth or special wipes. Never use cotton wool! 3. Replace all filter elements simultaneously: See the next item. Replace hydraulic filter Suction Filter: Clean (with every oil change) Return/Pressure Line Filter: Must be replaced with every oil change 1. The filter element is the "kidney" of the hydraulic system and must not be used beyond its expiration date. 2. Even if it doesn't appear dirty, its filtering performance may have deteriorated. 3. When replacing the filter element, ensure that the model and accuracy are exactly as specified by the manufacturer. Do not use inferior filter elements. Clean air filter (breather) Every 250 hours or monthly Remove the breather and blow it clean from the inside out with compressed air. If the environment is dusty, clean it more frequently. Damaged or excessively dirty oil should be replaced immediately. Check hydraulic oil quality Before every oil change or monthly Three Looks and One Smell Method: Look at the color: New oil is usually light yellow and transparent. If it becomes darker or blacker, it indicates oxidation and deterioration. Check for odor: A strong burnt odor indicates severe overheating and oxidation of the oil. Check for impurities: Place a drop of oil on filter paper and let it sit for a while to see if there are any visible particles forming. Check for viscosity: Rub the oil between your fingers; if it feels too thin or too thick, it's abnormal. Check the viscosity: Rub it with your fingers, if it feels too thin or too thick, it is abnormal. Tighten and clean the system Every 500 hours When the machine is stopped, check and tighten all pipe joints and flange bolts. Note: Do not tighten while the system is under pressure. Keep the entire hydraulic system clean and prevent dust from entering. Symptoms Possible Causes Troubleshooting and Solutions Leveling is slow and weak 1. Hydraulic oil level too low 1. Check the oil level 2. Hydraulic filter clogged 2. Check the filter element for differential pressure alarms or replace it immediately 3. Severe internal leakage in the hydraulic pump, resulting in reduced efficiency 3. Have a professional service technician check the pump's volumetric efficiency 4. Relief valve (pressure valve) set pressure too low or faulty 4. Have a professional technician check and adjust the system pressure System noise is high, pump makes unusual noises 1. Air in the suction line or clogged (most common) 1. Check the suction filter and fittings for tightness 2. Hydraulic oil viscosity too high (low oil temperature or incorrect oil grade) 2. Preheat the hydraulic oil or replace with the specified brand 3. Damage to hydraulic pump bearings or internal components 3. Repair or replace the hydraulic pump Oil temperature is too high 1. Improper hydraulic oil level (too high or too low) 1. Check the oil level 2. Severe internal leakage in the hydraulic system, resulting in significant energy loss 2. Check the pump, valves, and cylinder for internal leaks 3. Relief valve set pressure too high or permanently open 3. Adjust or repair the relief valve 4. Cooler (if present) clogged or fan not rotating 4. Clean the cooler and check the fan circuit Cylinder experiences creeping or vibrations 1. Air in the hydraulic system 1. Perform multiple full strokes to vent air 2. Worn or damaged seals inside the cylinder 2. Check the cylinder and replace the seals 3. Oil contamination, causing valve core to stick 3. Replace the hydraulic oil and filter element and clean the system Oil selection: You must use the anti-wear hydraulic oil of the brand and viscosity grade recommended by the equipment manufacturer. It is strictly forbidden to mix hydraulic oils of different brands and grades. Maintaining Cleanliness: The core of hydraulic system maintenance is preventing contamination. When disassembling, refueling, or replacing filters, ensure the cleanliness of the operating environment, tools, and hands. The saying "a speck of dust can destroy a precision hydraulic pump" is true. Bleeding: After changing the hydraulic oil or performing repairs, the system must be thoroughly bled. This typically requires operating each cylinder multiple times under no-load conditions to expel the air back into the tank. Professional Repair: For work such as pressure adjustment, disassembly of the hydraulic pump and motor, and repair of major valve blocks, it is strongly recommended that trained professional technicians or the manufacturer's after-sales service be performed. Improper adjustment and disassembly can result in more serious damage. Maintaining the hydraulic system of a concrete laser leveling machine requires careful daily observation and regular, standardized maintenance. By adhering to the principles of "clean oil, unobstructed filtration, appropriate flow rates, and rigorous operation," you can greatly ensure the stability and service life of the equipment, providing reliable support for your construction projects. ARMOUR JOINT CONCRETE LASER LEVELING MACHINE POWER TROWEL SLIPFORM MACHINE STEEL FIBER TOPPING SPREADERRead More
April 23, 2024
How to evaluate the smoothness of concrete pavement through quality inspection?
Assessing the smoothness of concrete pavements through quality testing ♢♢♢♢ Introduction The smoothness of concrete pavement is one of the important indicators for evaluating its construction quality and performance. Good flatness not only improves the aesthetics of the road, but also helps ensure driving safety and extend the service life of the road. Therefore, it is crucial to inspect and evaluate the flatness quality of concrete pavement. This article aims to discuss how to evaluate the smoothness of concrete pavement through quality testing, including testing methods, evaluation standards, and improvement measures. ♢♢♢♢ Method for testing the flatness of concrete pavement 1. Ruler method The ruler method is a common method for evaluating the flatness of concrete pavement. This method uses a ruler placed on the road surface and determines the smoothness of the road surface by observing the gap between the ruler and the road surface. The larger the gap, the worse the smoothness of the road surface. The ruler method is simple and easy to implement, but it is greatly affected by human factors and requires experienced inspectors. 2. Laser scanning method The laser scanning method is an advanced flatness detection method. It uses the principle of laser ranging to scan the road surface with high precision through a laser scanner to obtain the three-dimensional topography data of the road surface. Through data processing and analysis, the smoothness index of the road surface can be obtained. The laser scanning method has the advantages of high precision and high efficiency, and is suitable for large-area, high-precision road surface smoothness detection. 3. Level method The level method uses a level to measure the elevation of each point on the road surface, and determines the smoothness of the road surface by comparing the elevation differences between adjacent points. This method has high measurement accuracy, but requires more measurement points and complex calculation processes, and the detection efficiency is relatively low. ♢♢♢♢ Evaluation criteria for concrete pavement smoothness The evaluation standards for concrete pavement flatness are usually formulated according to relevant national and regional specifications. Generally speaking, the evaluation criteria include the following aspects: 1. Maximum gap The maximum gap refers to the maximum gap value between the ruler and the road surface in the ruler method detection. According to the specification requirements, the maximum gap value should be within a certain range. If it exceeds this range, the smoothness of the road surface will be deemed not to meet the requirements. 2. Smoothness index Smoothness index is a comprehensive index obtained by counting and processing the elevation data of multiple measuring points on the road surface. This index can comprehensively reflect the smoothness of the road surface and is an important basis for evaluating the smoothness of the road surface. 3. Driving comfort Driving comfort refers to the smoothness and comfort of a vehicle when driving on the road. A well-smooth road surface should ensure the smoothness and comfort of vehicle driving and reduce vehicle wear and driver fatigue. ♢♢♢♢ Measures to improve the smoothness of concrete pavement 1. Optimize construction technology: Construction technology is one of the important factors affecting the smoothness of concrete pavement. Optimizing construction techniques, such as reasonably controlling the water-cement ratio and using efficient vibration equipment, can improve the compactness and uniformity of concrete, thereby improving the smoothness of the road surface. 2. Strengthen construction quality control: Quality control during the construction process is the key to ensuring the smoothness of concrete pavement. Construction units should strictly carry out construction in accordance with design requirements and technical specifications, and strengthen control over raw materials, construction equipment, construction techniques, etc., to ensure that construction quality meets requirements. 3. Deal with pavement defects in a timely manner: During and after construction, pavement defects, such as honeycombs, pitted surfaces, cracks, etc., should be discovered and dealt with in a timely manner. For minor defects, repair measures can be taken to deal with them; for serious defects, rework should be carried out to ensure the smoothness and flatness of the road surface. 4. Strengthen care and maintenance. Concrete pavement will be affected by natural factors and traffic loads during use, causing the smoothness of the pavement to gradually decrease. Therefore, it is crucial to strengthen the maintenance and maintenance of road surfaces. Regular cleaning of the road surface, timely repair of damaged parts, and preventive maintenance can extend the service life of the road surface and maintain its smoothness and smoothness. ♢♢♢♢ Summary and Outlook The flatness assessment of concrete pavement is a complex and important task involving multiple testing methods and evaluation standards. By rationally selecting testing methods and applying evaluation standards, the flatness of concrete pavement can be accurately evaluated, and corresponding improvement measures can be taken to improve the performance of the pavement. With the continuous advancement of science and technology and the emergence of new detection technologies, the evaluation method of concrete pavement flatness will be more accurate and efficient. In the future, we can look forward to the application of more intelligent and automated testing equipment and methods in concrete pavement flatness assessment, providing strong support for improving pavement construction quality and performance.Read More
November 27, 2025
The entire process and key control points of the construction of the diamond sand wear-resistant floor
There are various methods for basement floor construction. Among them, the construction of diamond sand floor and diamond sand floor with curing agent is favored by many real estate projects due to its economic, wear-resistant, pressure-resistant, anti-pollution and easy-to-clean features. However, improper manufacturing processes can also lead to quality issues and potential risks. This article will respectively introduce the diamond sand wear-resistant floor from the perspective of technology and the prevention and control of common problems. 1. Diamond sand floor Compared with ordinary concrete floors, diamond sand floors have better wear resistance, compressive strength and impact resistance, and have a longer service life. However, from the perspective of microstructure, the surface of the diamond sand floor is relatively rough, and the capillary structure of concrete has a low resistance to the penetration, pollution and corrosion of substances such as acids, alkalis and oils. 2. Corundum + cured floor The construction of adding curing agent to the diamond sand floor. When the diamond sand floor is applied with a curing agent, it better makes up for the above deficiencies. Moreover, as the curing agent penetrates and forms a film, it enhances the integrity of the original surface, significantly improving its surface strength and wear resistance. After long-term use, it is obviously superior to the ordinary diamond sand floor in terms of cracking, powdering, and dusting, and is also easier to clean. It has extremely strong wear resistance, pressure resistance and impact resistance The diamond sand floor itself has excellent wear resistance. After adding a curing agent, the strength and hardness of the floor are further enhanced, and its wear resistance, pressure resistance and impact resistance are also significantly improved, and the durability of the floor is greatly enhanced. 2) Prevent sanding and dusting The main advantage of the diamond sand reinforced floor is its ability to prevent sanding and dusting. After the application of the curing agent, the surface hardness (indicated by the diameter of the indentation) and wear resistance (indicated by the length of the grinding pit) can be effectively enhanced. The surface becomes denser and has better integrity, which can effectively prevent sanding and dusting. 3) Waterproof, oil-proof and anti-corrosion The surface of a common diamond sand floor has pores that are hard to see with the naked eye. Water, oil and other corrosive liquids can seep into the interior of the floor through these holes and gaps. The most notable feature of the curing agent is its excellent sealing property, just like coating the floor with a film to prevent erosion. 1. The surface of the floor is firmly combined with the base layer, without any hollowing or sanding phenomena. 2. Surface layer quality: Uniform color, no obvious color difference, no scratches, no slag inclusions. The surface must not have cracks and hollowing is not allowed. 3. Gloss requirements: Achieve medium to high brightness, and the lamp should have a reflective effect when illuminated. 4. Joint: Uniform width, and the inside of the joint should be thoroughly cleaned. 5. The hardness of the floor should reach above 6.5 on the Mohs scale (tested by a hardness tester). 6. The trachoma rate shall not exceed 3 per square meter. 1. The strength of the concrete shall not be lower than C25. 2. The smallest possible water-cement ratio. A water-cement ratio that is too high can cause bleeding on the concrete surface and reduce the compressive strength of the concrete surface. Therefore, the water-cement ratio should be as small as possible, generally controlled below 0.5. 3. Commercial concrete should be used as much as possible. If on-site mixed concrete is used, its slump should be controlled at 1 to 3cm. The slump of commercial concrete is between 12 and 14cm. The diameter of the larger crushed stones shall not exceed 30mm. 4. When the concrete thickness is greater than 8cm, ordinary concrete should be used for pouring; when the concrete thickness is less than 8cm, fine aggregate concrete should be used for pouring. 5. Concrete should be leveled immediately after pouring, with a flatness of no more than 2mm within a 2-meter range. 6. Before the surface layer construction, the base concrete and vibration slurry should be sufficient (not less than 5mm). 7. The mud content of sand and gravel in concrete shall not exceed 2%. 8. After vibration grouting, the bleeding of the concrete should be uniform. If there are water pits, they must be removed and the surface leveled again; otherwise, the flatness of the diamond sand floor construction cannot be guaranteed. 1. Construction of diamond sand floor 1) The ground concrete is poured in sections and leveled immediately after pouring. When multiple locations are being poured simultaneously, pay attention to the construction sequence being carried out in one direction and consider the consistency of the mating surfaces. ② Concrete should be leveled with a long roller or a long straightedge after being pushed flat. Three to five hours after the concrete is poured, it should be observed that there is no bleeding on the surface and it has reached the initial setting state. 2) Use a mechanical trowel to tap the slurry in a round motion. For fine areas, use a wooden trowel to trim the edges. The main purpose is to smooth the concrete surface and reduce the floating slurry. Pay attention to troweling in the same direction as pouring. 3) Sprinkle the wear-resistant aggregate in two batches. In the first batch, evenly spread two-thirds of the wear-resistant material on the already troweled cement floor. 4) For the second time, evenly spread the remaining 1/3 of the wear-resistant material on the surface of the concrete, and use a mechanical trowel with a disc installed to work crisscross and cross at least twice. 5) Use a mechanical trowel (metal disc) to smooth it out multiple times back and forth. For the fine corners and edges, use a manual trowel in coordination with the construction. The time for the next process should be determined based on the temperature and humidity. 6) When the surface of the floor begins to harden, use a mechanical trowel with a metal blade to grind and smooth it, and repeat this operation 3 to 4 times. (Construction workers must wear soft flat shoes to avoid damaging the surface. The fine corners and edges should be polished by hand.) 7) Water curing should be carried out on the polished wear-resistant floor (mainly to prevent the evaporation of surface moisture and ensure the stable growth of the wear-resistant material's strength). The curing period is 7 days. 8) After the surface has cured for a certain period of time (5 to 6 hours after the completion of the wear-resistant material floor), use a mechanical trowel equipped with a metal blade for the final polishing and leveling. 9) Mold and compartment cutting (this can be done according to the actual situation on site and the owner's needs). Mold removal can be carried out the day after the completion of the diamond sand floor. During the operation, be careful not to damage the edge of the floor. The size of the compartments shall be determined by Party A on the third day after the completion of the diamond sand floor. 2. Application of penetrating liquid hardener (commonly known as curing agent) The original color of the diamond sand floor should be cured for more than 14 days, while the colored diamond sand floor usually needs to be cured for 28 days. Only after the color has matured can the penetrating liquid hardener be applied. The specific measures are as follows: Before construction, clean and remove debris, oil stains, paints, curing agents, etc. from the ground. If there are any pits or cracks, they should be repaired in advance with cement-based jointing mortar and maintained for 3 days. If no repair is needed, proceed with the construction directly. 2) Sprinkle water on the base layer until it is fully moistened. Do not sprinkle too much. 3) Use a 50-mesh resin grinding disc to grind the base layer, removing the floating slurry and stains on the base layer to make it free of roughness and gradually smooth. 4) After the 50-mesh grinding is completed, use a 150-mesh resin grinding disc for grinding. After grinding, use a high-power vacuum cleaner to suck up the mud and sewage on the surface of the base layer. 5) Sprinkle water on the surface of the base layer and grind it with a 300-mesh resin grinding disc (the ground should be ground evenly in a grid pattern, and the machine's pushing speed should be one step per second to grind off the remaining materials and fine scratches on the ground). After grinding, grind it with a 500-mesh grinding disc. Then, use a vacuum cleaner to suck up the wastewater and ventilate to dry the base layer. 6) After the base layer is dry, if the surface turns slightly white, apply the concrete sealant and hardener. Sprinkle the material evenly and spread it evenly with a mop. Keep the base layer surface moist for 30 minutes. If there is rapid penetration in some areas and it has dried, sprinkle the material again and use a mop to evenly moisten the base layer. 7) After 30 minutes, the surface of the concrete sealant and hardener begins to thicken. Water should be sprinkled on its surface and pushed back and forth with a long-bristled brush or floor scrubber to dilute the excess hardener and better penetrate into the base layer. After one hour, the excess material and water should be sucked dry with a vacuum cleaner to ensure that the base layer is dry for more than 12 hours. 8) After 12 hours, sprinkle water on the base surface of the completed construction material, and grind it with a 500-mesh resin grinding disc to remove the excess material. Then, grind it with a 1000-mesh grinding process. After grinding, use a vacuum cleaner to suck up the wastewater. 9) After 12 hours, the base layer has basically dried. Then, it is ground and polished with a 2000-mesh resin grinding disc to gradually give its surface a lustrous appearance. 10) For each mesh size, the grinding discs should be cross-ground 3 to 5 times in both the longitudinal and transverse directions. 11) Special treatment ① Corner and edge treatment: Large machinery can only be used for large-scale grinding. For corner and edge positions, a portable Angle grinder should be used for grinding and polishing, following the same method as for large-scale construction. When the base layer has poor strength and severe sanding, it is necessary to reinforce the base layer first, and then proceed with the normal construction process. First, use a 300-mesh resin grinding disc to remove the floating slurry on the surface of the base layer. Then, evenly sprinkle the concrete sealant and hardener to ensure it fully wets and penetrates into the base layer. After 12 hours, when the concrete sealant and hardener has cured and the strength of the base layer has improved, follow the normal process: 50-mesh grinding (water grinding) → 150-mesh grinding (water grinding) → 300-mesh grinding (water grinding) → construction materials → 12-hour drying and curing → 500-mesh grinding (water grinding) → 1000-mesh grinding (water grinding) → 2000-mesh grinding (dry grinding). The aesthetic effect of the floor cannot be achieved without meticulous control during the construction process. Besides strictly adhering to the corresponding techniques and methods, the prevention of common quality problems also requires attention. If the construction is not done properly, many problems will occur during later use. Now let's talk about the common quality problems of the diamond sand wear-resistant floor and how to prevent them. There are mainly three reasons for the color difference of corundum: 1) Material selection issues; 2) The materials were not spread in several portions, the amount of materials used was insufficient, and the thickness was uneven. 3) Maintenance issues: The use of covering with plastic film for maintenance led to uneven evaporation of ground moisture. The area where the film comes into contact with the floor is whitish, while the area where it does not touch the floor is normal in color. Preventive measures Choose a manufacturer with stable and reliable product quality and a good reputation. 2) The spreading of materials should be carried out strictly in accordance with the requirements of the briefing in several portions, with a usage of no less than 5kg/m². 3) Plastic film curing is strictly prohibited. During summer construction, water spraying curing can be adopted in several batches (with an interval of 2 to 3 hours). The allowable deviation of ground flatness is ≤2.5mm/2m in both longitudinal and transverse directions. The reasons for the deviation during construction are: 1) The template setup is out of tolerance; 2) The concrete part was not leveled in accordance with the standard. 3) The wear-resistant material is not evenly spread. Preventive measures 1) Strictly calibrate the elevation lines. Set up steel rods every 2 meters or so. The elevation of the steel rods should be the same as that on the longitudinal seam formwork. Check with a level. 2) The joints should be roughened and leveled in advance. When pouring new concrete, the levelness should be consistent with that of the already poured ground. Any low-lying areas should be replenished and filled in a timely manner. 3) Wear-resistant aggregates should be spread in two portions. The first dosage should be two-thirds of the total dosage. Ensure that the mixture falls evenly. Do not throw it forcefully to avoid the separation of aggregates and cement. After the wear-resistant material has absorbed a certain amount of moisture, it is ground and dispersed with a grinding machine and then combined with the base concrete slurry. For the second spreading, apply the remaining one-third in a direction perpendicular to that of the first spreading. When spreading, first use a straightedge or a straight scraper to measure the levelness, and adjust the uneven areas of the first spreading. After spreading, immediately smooth and polish it, and repeat the grinding machine operation at least twice. When the grinding machine is in operation, it should be carried out alternately in the longitudinal and transverse directions, evenly and orderly, to prevent material accumulation. The third time mainly involves repair treatment. For low-lying areas, materials are replenished and leveled. For corners and edges that cannot be covered by the grinding machine, manual flattening and smoothing are adopted. There are the following situations regarding ground cracks: If the initial setting time of concrete is not well controlled and the diamond sand wear-resistant aggregate is scattered when the moisture content of the concrete is relatively low, it is easy to cause cracks after the construction is completed. 2) Improper construction methods, insufficient thickness of the wear-resistant layer (corundum layer), rapid water loss (such as excessive construction environment atmosphere, etc.), resulting in volume shrinkage and linear shrinkage, causing cracks or hollowing. 3) Improper maintenance: After the completion of construction, the ground was not maintained within the prescribed time or was not adequately watered for maintenance. When the concrete temperature is relatively high, pouring cold water for curing can also cause cracks. Note: When using only the diamond sand floor, it is recommended to use a maintenance agent (oily and film-forming effect) to maintain the floor. If the corundum is reinforced (or epoxy), water curing can be directly adopted. 4) The contraction joint was cut late, and cracks appeared due to thermal expansion and contraction. Under normal circumstances, it is advisable to cut the expansion joints 24 to 48 hours after the completion of the construction of the corundum floor. If it is too late, as the hardness of the floor gradually increases, the floor is prone to "cracking" and developing cracks during the cutting process. 5) If the spacing of the division joints is too large, cracks may also occur. Preventive measures 1) Strictly control the time of the first sprinkling of materials; 2) The concrete layer and the wear-resistant layer (corundum) are constructed simultaneously. 3) The curing time shall be no less than 14 days; 4) Reasonably control the cutting time; The spacing of the division joints should generally not exceed 6m*6m. Cause of formation 1) The roughening and polishing processes are rough. 2) Inadequate maintenance and insufficient maintenance time; 3) The spreading time of wear-resistant aggregates is not well controlled. Preventive measures 1) Use a grinding machine to thoroughly smooth, compact and roughen the ground for no less than three times, and use a floor trowel to thoroughly smooth and level the ground for no less than three times. 2) The curing time shall be no less than 14 days; 3) Strictly control the spreading time of wear-resistant materials. The timing of spreading wear-resistant materials varies as needed, depending on factors such as climate, temperature, and concrete mix ratio. Spreading too early will cause the wear-resistant material to sink into the concrete and lose its effect. If it is spread too late, the concrete will gradually lose its adhesive force due to solidification, preventing the wear-resistant material from fully bonding with it. The most convenient way to determine the time for spreading wear-resistant materials is to let your feet sink about 5mm when stepping on the ground, and then you can start the first spreading work. The moisture at the edges of walls, columns, doors and formwork disappears more quickly. It is advisable to prioritize the application of water to prevent the effect from being reduced due to water loss. 1. Local damage: Clean the damaged area thoroughly, soak it in water to moisten it, then repair it with a putty made of styrene-butadiene latex mixed with water and a hardener material that has screened out the aggregates. Finally, apply the styrene-butadiene latex mixed with water emulsion. 2. Large-scale damage: According to actual needs, lines can be drawn and sawn on the damaged area, the surface layer and part of the base layer can be chiseled off, then the area can be cleaned and moistened, the plain cement slurry can be swept, concrete can be poured, and finally the surface layer of the diamond sand hardener can be applied. 3. Floor peeling: The surface of the wear-resistant diamond sand floor curls and peels. Remedial measures: Cut and chisel off the peeling area (chiseling it into a pitted surface), spray water on the pitted area to moisten it, then apply repair mortar of the same grade as the concrete and press it down to level the ground. Finally, apply a curing agent. 4. Remedial measures for cracks in diamond sand floor: 1) Cracks in areas with requirements for anti-seepage, impact resistance and wear resistance on the surface should undergo surface treatment. 2) For cracks that can affect the integrity, strength, impermeability and steel bar corrosion of the structure, grouting treatment should be carried out. 3) For cracks that endanger the safe operation of buildings, in addition to grouting treatment, other reinforcement measures should also be taken when necessary. 4) Cracks that are sensitive to temperature should be treated when the crack opening is relatively large in the later stage of the low-temperature season. 5) Flexible materials must be used to treat active cracks. Note: The parameters provided in this document are for reference only and are not mandatory. Due to differences in technical characteristics between different brands and models of laser levelers, please consult the manufacturer for a suitable solution before actual operation. This reference document assumes no responsibility for any issues arising from failure to follow the manufacturer's instructions.Read More