Experienced manufacturers answer your questions about cleaning the laser leveling machine oil tank
September 27, 2024
Experienced manufacturers answer your questions about cleaning the laser leveling machine oil tank 2
The fuel tank of the laser leveling machine is also a relatively important component. It is used to support the movement of the equipment. If there is no fuel tank, the equipment still cannot move normally. It is as important as the engine. Many users will have many questions about the cleaning of the fuel tank when using it. We should be careful not to clean the protective film in the fuel tank when cleaning, which will affect the normal use of the equipment.
1. Why should the fuel tank of the laser leveling machine be cleaned regularly?
As the laser leveling machine is used for a longer time, the precipitated impurities in the gasoline will accumulate more and more in the fuel tank. These impurities will first settle at the bottom of the fuel tank. When there are too many sediments, they will enter the car engine with the fuel, causing serious wear and tear on the engine. As long as you clean the fuel tank once, the owners will find how necessary it is to clean the fuel tank regularly. In the process of cleaning, not only particles and colloids, but even incredible things such as tin foil and plastic sheets will be washed out. Many things do not know how the owners get into the fuel tank. If these wastes are not cleaned up in time, the impact on the engine of the laser leveling machine is imaginable.
2. How to clean the fuel tank of the concrete laser leveling machine?
The cleaning of the fuel tank is divided into two steps, the internal and external. When cleaning the engine fuel system, the engine non-disassembly cleaning agent should be used, because the non-disassembly cleaning agent does not need to disassemble the fuel system. On the one hand, it can start to thoroughly clean the fuel system, and on the other hand, it is beneficial to protect the engine's fuel system. When cleaning, you can use a clean cloth to block the fuel pipe mouth, and then constantly change the position and direction of the plastic pipe, try to avoid rubbing the oil level sensor, blow and wash for 20 minutes, and release the gasoline. At this time, the impurities in the gasoline will flow out together. It should be noted that the fuel released from the fuel tank should be used after 72 hours of precipitation. When cleaning the outside of the laser leveling machine tank, it is necessary to check whether there are dents or oil leakage in the fuel tank, fuel pipes, joints, etc., and check whether the fixing screws of the fuel tank bracket are tightened. When cleaning the inside, open the fuel tank mouth, take out the filter barrel, suck out the oil, and then insert the cleaned plastic pipe from the fuel filling port to the bottom of the fuel tank, and gently blow the gasoline at the bottom of the fuel tank to make it roll to achieve the cleaning effect.
The above are many questions about cleaning the laser leveling machine. It will be helpful for you if you can understand them in detail. Secondly, you should pay attention to regular care and maintenance during use, which can also reduce the occurrence of equipment failures. Thank you for your continued attention and support.
About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
WS740 concrete laser leveling machine: the apparatus guide by laser for concrete leveling. Laser leveling leveling machine could greatly improve the concrete smoothness and compaction. as well as prolong the service life of concrete floor. Walk-behind two wheels concrete laser leveling machine, mainly used in large area concrete construction, such as workshop, supermarket, warehouse, airport, playground and so on. This laser leveling can satisfy the construction requirement of large area and high flatness and levelness. As for laser leveling: A new concrete construction,while construct a large area of concrete floor,use laser leveling machine to vibrate new concrete,leveling and control the standard elevation from ground. Technical Description:First,set a fixed laser transmitter,the transmitter emits a laser beam rotation forming a laser control plane,using handheld receivers lever floor elevation guide to the leveling head of Tank concrete laser leveling machine,the automatic control system of leveling machine receiver laser signal (10 times/sec frequency) based on the laser leveling head sensed,then adjust the elevation automatic in real-time,because the laser emitter after the set is fixed,so it can make sure does not produce a cumulative error while a large area of ground construction.
Read More
April 30, 2019
Common Sense of Using the Power Section of the Small Road Roller
First, the use of precautions1. When using, adjust and maintain according to the maintenance methods and various regulations described in the corresponding product manual. 2. It is not allowed to work at full speed and full load immediately after starting. It must be gradually transitioned from low speed and no load to high speed full load. 3. The fuel used in the diesel engine must be clean and should be allowed to stand for more than 72 hours. 4. The normal water temperature (75 °C ~ 95 °C) should be maintained for the diesel engine with radiator. When releasing the cooling water, you must first open the radiator cover (after the water temperature is lowered, then open it to avoid burns), and then unscrew the water discharge switch on the cylinder block. 5. The normal working oil pressure should be 0.2~0.4MPa. 6, the load must be strictly controlled, no overload is allowed, otherwise it will affect the reliability and service life of the diesel engine. 7. After the new or replacement injector, the medium-speed low-load running-in should be carried out, and the running-in time should not be less than 30 minutes. Before installation, the parts should be cleaned with clean kerosene or light diesel oil to remove anti-rust oil. 8. In the course of operation, if abnormal phenomena are found, stop in time. Second, fuel, oil and cooling water 1. Fuel Users should select the light diesel grades to be used according to the season and ambient temperature of the region. Recommendation: Use diesel fuel with a sulfur content below 0.5%. If the sulfur content is high, the oil change cycle will be shortened. Diesel filling and precautions Before the diesel engine is injected into the diesel engine, it must be allowed to stand for more than 72 hours, then the upper layer of clean diesel oil without water and impurities or filtered with silk cloth. Warning: (1) Do not fill fuel tank with fuel while the engine is running. (2) Do not smoke when filling the fuel tank with diesel fuel. (3) Use a clean oil pipe when refueling. Do not splash diesel oil outside. (4) Wipe off the spilled fuel. Materials that are fueled must be moved to a safe place. 2. Lubricating oil The oil must be selected according to the regulations. The viscosity of the oil is greatly affected by the temperature, and the user needs to correctly select the corresponding brand oil according to the ambient temperature. 3.cooling water should use clean soft water: rain, tap water or river water. If you use well water, spring water or other hard water with more minerals, you should add appropriate amount of softener, such as sodium carbonate (soda). The easiest way to do this is to boil the water and then precipitate it to remove impurities and use. In the cold winter, antifreeze can be added to the cooling system to prevent freezing. The most commonly used antifreeze is an aqueous solution of ethylene glycol (glycol) or alcohol. The use of antifreeze should be noted: Since the antifreeze has the characteristics of increasing volume with increasing temperature, when adding the cooling medium, the addition amount should be 5% to 6% less than the total capacity of the cooling system. Ethylene glycol – water-based antifreeze is toxic, special care should be taken when using it, and no entry is allowed. The boiling point of ethylene glycol is 194.4 ° C, so the water in the antifreeze is easy to evaporate, and the alcohol should be properly added after a period of use. If it is not anti-rust antifreeze, it should be removed regularly. When the diesel engine is used for a long time, the surface of the cooling water chamber will form scale, which will affect the heat dissipation of the diesel engine. For this reason, the scale should be cleaned regularly. The cleaning method is as follows: When cleaning, 25% hydrochloric acid solution can be injected into the water chamber and parked for 10 minutes. After that, the solution was drained and washed with water. If the scale is not removed, repeat it again Cooling water filling and precautions: (1) Fill the cooling water to the mark of the filling port. (2) Note that the drain valve is closed after the cooling water flows out from the drain valve. (3) Tighten the filler cap. (4) Start the engine and run to normal temperature until the thermostat is turned on (the cooling water pipe is obviously warmed up during the big cycle). (5) After the first operation, stop cooling and check the liquid level. Inspection and preparation before starting 1. When the new machine is started for the first time, carefully check the tight connection of each part, whether the attachment is complete, and whether the operating mechanism is flexible. 2. Check the oil level of the oil pan and the fuel injection pump between the upper limit mark and the lower limit mark of the oil scale. 3. Check the fuel storage capacity of the fuel tank. Turn on the fuel tank switch to allow diesel to flow to the fuel injection pump and remove air from the fuel system. 4. Check the battery and wiring. Check the electrolyte level in the battery. 5. Check the cooling system and add enough water. 6. In case of cold and freezing weather, the diesel engine should be placed in a cold-proof place. When working in the field, heat the oil sump and add two or three times of hot water to warm the diesel engine before starting. 7. The clutch should be in the separated state when the diesel engine starts. Startup After the preparation work before starting is completed and confirmed to meet the requirements, it can be started. The clutch should be disengaged when starting. The starting steps are as follows: 1. Push the lock switch to start the diesel engine. The starting time is less than 5 seconds each time to protect the starter and battery. After each failed start, stop for 1-2 minutes and start again. If the start fails three times in a row, you should find out the cause and troubleshoot before starting again. Once the diesel engine is started, the starter switch key should be released immediately and the lock switch should be returned to its original position. 2. Check the oil pressure immediately after starting. When the diesel engine is running at idle speed, the oil pressure should not be lower than 0.05MPa. After the newly assembled diesel engine is started for 5 minutes, stop the oil level of the oil pan and check if necessary, add oil so that the oil level is between the upper and lower marks on the oil scale. 3. Within one minute after starting the diesel engine, the water temperature gauge should be checked immediately to confirm that the cooling system is working properly. V. Operation After the diesel engine is started, the full-load operation should not be carried out immediately. The diesel engine should be heated in the idle mode at low speed and medium speed. 1. When operating, always pay attention to the oil pressure and cooling water temperature. When the speed is calibrated, the oil pressure should be 0.2~0.4MPa (2~4kgf/cm) 2. The temperature of the cooling water outlet is controlled at 80-90 °C. 3. When the diesel engine is running, always pay attention to observe whether the reading on the instrument panel is normal, whether there is abnormal sound. If it is found, it should be stopped immediately to check and find the cause and then allow it to start and run again. 4, always pay attention to the sealing of the oil and water connections, if there is a leak, it should be immediately removed. 5. The charging generator must be charged to the battery during operation, and the ammeter pointer points to “+”. 6. New or overhauled diesel engines are allowed to run at full speed at full speed after 50 to 100 hours of operation. Small roller parking 1. Remove the load and gradually reduce the speed to idling for 3 to 5 minutes before parking. 2. When the temperature is lower than 5 °C, if antifreeze is not used, the cooling water should be drained in time after parking to prevent cracking of the body. 3. After each stop, the faults found during operation must be discharged in time, and necessary inspections should be carried out. The diesel engine should be inspected and maintained frequently, and some sporadic faults should be eliminated in time to keep the diesel engine working properly and avoid serious faults. The necessary conditions for good economic returns. Daily maintenance of small road roller: (in combination with inspection preparation work), the driver usually carries out maintenance every day; check the fuel tank fuel quantity and add enough; check the oil level in the oil sump, when it is insufficient, it should be added; check and eliminate leakage and leakage Oil and gas leakage; check the stability of each accessory device; check the liquid level of the water tank.
Read More
March 23, 2023
Laser leveling machine – four construction advantages
It is reported that over the years, the growth rate of the machinery industry has been higher than the industrial average, and the growth rate of benefits has also been higher than the growth of production and sales in the same period last year. Concrete laser paver, as a necessary equipment in construction machinery, has also maintained a high sales volume. Concrete laser leveling machines can be seen everywhere in today's building floor construction. Why are concrete laser leveling machines so popular? Let's analyze the four distinctive features of Shandong Wanshi Machinery's concrete laser leveling machine. Shandong Wanshi Machinery "Leilong" brand concrete laser leveling machine increases production efficiency by 61%, saves construction cost by 49%, shortens construction period by 40%, increases the strength and compactness of the floor by 25%, and the flatness error reaches the level of German related products standard. Let's take a look at the four distinctive features: 1. Intelligent handle operation mode, flexible operation, single person can operate construction. The movement and steering are flexible and convenient. The walking system is controlled by the handle, so that the machine can move freely without affecting each other with the leveling head. The wheel is manually controlled to move forward, backward, turn and travel speed, and the movement is very convenient. 2. The laser transmitter is arranged independently, and the large area is paved as a whole to ensure that the ground elevation is consistent. The elevation is not controlled by the formwork, and there will be no error. Large-scale block construction can reduce construction joints and greatly reduce the maintenance cost of the ground. 3. Integrated leveling head: It is composed of scraper, vibrator, vibrating plate, stirring cage and other components. It integrates multiple processes such as stirring, leveling, vibrating, and vibrating, and is completed by the machine at one time. Improve efficiency and save labor. In the case of undulating foundations and sloping road surfaces, maintain a level surface for construction. The high-frequency vibration of 4000 times per minute makes the vibrating plate of the leveling head vibrate evenly at high frequency, making the concrete floor dense and dispersing the deformation stress. It can effectively solve the problems of hollowing, shelling, cracking and inequality on the ground. 4. The laser measurement and control system automatically controls the elevation. The design elevation of the top surface of the floor is automatically controlled by the laser machine computer, which can ensure the flatness of the ground and achieve accurate. leveling directly on the concrete layer. The flatness of the ground is not affected by the vibration of the construction formwork, and no formwork is needed in the middle , Reduce the input of artificial materials, shorten the construction procedure and speed up the construction progress. The construction area per hour is more than 300㎡, and the daily workload can be more than 3000㎡ to 5000㎡, and the operation efficiency is greatly improved! The concrete laser leveling machine produced by Shandong Wanshi Machinery has its own intellectual property rights. The new generation of products is under research and development. The core components of the products are imported from Germany, the United States, Japan, etc. to ensure durability, safety, and reliability. The production equipment is complete. Fully meet customers' needs for high-quality products, welcome to come to the company to discuss cooperation if necessary.
Read More
Online now. Replies personally on WhatsAppFionaCustomer specialist
Hi! I am here to help you find the right solution for your project.
You can share your product, capacity, or project needs. Our specialist will help you work out the next step.
Would you like a quick answer? Tap below to speak directly with our specialist on WhatsApp.