Laser leveling machine manufacturers talk about: New technology of large-area floor leveling construction

| with the continuous improvement of the requirements of modern industrial plants for concrete floor flatness, Traditional Floor Leveling Construction Methods Can Not Fully Meet The Requirements Of Quality, Construction Period And Other Aspects, Therefore, The Introduction Of High-tech Laser Leveling Machine For Large-scale Floor Paving, Compaction, Leveling Is The Inevitable Trend Of The Present. Compared With The Traditional Construction Method Of Guideway Leveling Beam, The Application Of Laser Leveling Machine Can Not Only Effectively Solve The Problems Of Ground Hollow Drum And Cracking, But Also Help To Reduce Costs And Speed Up The Construction Progress. The Following Laser Leveling Machine Manufacturers On A Large Area Of Floor Construction Technology To Make A Simple Discussion. | |
|
☾ Construction site arrangement and management ☽ :
1. Remove obstacles at the construction site.
In the actual construction process, it is necessary to remove all obstacles in the construction area, such as ditches, garbage, communication lines, etc., and migrate high-voltage lines or communication lines after being allowed by relevant departments. If obstacles that cannot be moved or removed are encountered, they need to be adjusted or avoided in time.
|
|
|
☾ Large area floor treatment work ☽ :
When the formwork is fixed, it is necessary to use steel bars to fix it, and set the cement mortar pad to ensure that the formwork does not shift during the concrete pouring process and the thickness of the protective layer meets the requirements. Before large-scale floor concrete pouring, the concrete surface on both sides should be chiseled, the steel bar should be removed and the position should be corrected, and the garbage should be cleaned. Under normal circumstances, the floor and the casting belt adopt an independent support system that is supported separately from the bottom formwork, which can effectively control the floor compared with the whole formwork, because the deflection caused by mold removal increases, and because no secondary formwork is required, manual use is reduced, which has good economic benefits. The pouring time of the expansion post pouring belt is generally carried out 60d after the completion of the concrete pouring in the adjacent parts, and watering and wetting treatment should be done 24h in advance before construction. The concrete used is micro-expansive concrete with a strength grade higher than the corresponding structural position to prevent cracks. In the process of construction, the laser leveler manufacturer recommends the use of C35 concrete mixed with 12%SY-G. After the completion of concrete pouring, the construction site should be covered with moisturizing curing treatment within 12h, and the curing time should not be less than 28d. Watering net is strictly prohibited when the average temperature of the day is below 5℃. |
|
|
☾ Concrete paving work ☽ :
When the large-scale floor concrete paving work, many factors such as the position of the formwork and the supporting condition should be strictly checked. When the concrete is dumped after the inspection, it should be carried out according to the guidance of the professional of the laser leveling machine manufacturer to ensure that the concrete is dumped to the specified position. If there is any fault in the large-area floor paving, it is necessary to immediately suspend the construction for more than 1 hour. For example, when the mixing material cannot be vibrated, it is necessary to install construction joints on the floor after the completion of the floor paving, and discard the mixing material that cannot be vibrated. When the plug-in vibrator vibrates the mixture, it is necessary to lift the pulp and scrape it with a laser leveler. Two vibrators should be installed on the vibrator in a large area of the floor, so as to form a transverse vibratory group on the ground and carry out continuous vibratory work along the cross section. In the vibration work, it is necessary to pay attention to the position of the bottom of the board on the ground, and the problem of under-vibration or missing vibration must not occur in the position of the interior and corners. The vibration time is about 30 seconds, and the relevant personnel should supplement the material beside the vibration real-time, and strictly supervise and manage the tension rod and effect of the template transmission rod of the vibration. When deformation, leakage displacement and loosening occur, it should be corrected immediately. |
|
| The above three aspects of the construction site management, floor treatment, paving of large area floor leveling construction technology are discussed in detail. In order to effectively improve the quality and efficiency of floor construction, laser leveling machine manufacturers suggest that: in the actual construction process, the operator also needs to fully grasp the characteristics of the leveling machine, and combine it with the construction, so as to achieve a more ideal construction standard. |
Share this article

About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Previous Post
Next Post
Related Articles