When the concrete laser leveler is working on the road surface, the temperature increase may cause some parts of the equipment to overheat, thus affecting the correct leveling effect of the equipment. So, how should the temperature of the leveler be controlled during operation? Next, let's take a look at how our company's technicians teach you how to control the temperature of the leveler during operation!
How to control the temperature of the leveler during operation?
First of all, controlling the temperature of the leveler is one of the keys to ensuring the quality of leveling. When the equipment is leveling, it should meet the requirements of relevant standards according to the asphalt type, grade, consistency, ambient temperature, leveling thickness, etc. . Secondly, when the construction temperature of expressways and first-class highways is lower than 10℃, and the construction temperature of other grades of highways is lower than 5℃, it is not suitable for leveling. If leveling work must be carried out, the temperature of the road leveler should be increased, and there are also low-temperature leveling requirements that meet the regulations. The material transporter must have insulation measures, and high-precision levelers should be used as much as possible to start paving, and the trade plate should be heated and leveled immediately after the pressure is applied to shorten the length of the pressure. Finally, remember that leveling should meet the requirements of relevant standards according to asphalt type, grade, consistency, ambient temperature, leveling thickness, etc., so that it is relatively simple and easy to control the temperature.
Precautions for leveling machine:
1. After completing the leveling operation, perform routine maintenance operations in accordance with the contents of the routine maintenance procedures. 2. The working devices and motion mechanisms of the leveling machine that are in direct contact with the asphalt mixture during the operation should be sprayed with diesel after the operation and then run for a period of time to remove the residual asphalt on them, so that they can operate freely and rotate flexibly. It is forbidden to spray diesel on the electronic control system and spiral wire to prevent fire when the power is turned on. 3. After leveling the fly ash soil, flush with water to flush away the white material. After flushing, use waste hydraulic oil to lubricate the active parts of the scraper conveyor chain and apply anti-rust oil to the piston rod. Be careful not to flush water to the electrical appliances and bearings to prevent short circuits and foreign objects from entering the bearings. 4. Clean and check the lifting and adjusting device of the longitudinal slope meter, and lubricate the screw with grease. Apply grease to the floating arm slide rail. Fill each oil filling point with grease until the joints overflow. For levelers with oil filling cups, observe the consumption and fill them up at any time.
Have you learned all the above? If you want to know more about concrete laser levelers, please continue to pay attention to this website
About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Requirements and treatment for troweling the concrete base layer before grinding special floors (such as epoxy floors and curing agent floors)
The success of special floors (such as epoxy floors and curing agent floors) is "70% dependent on the base layer and 30% on the materials". The quality and treatment of the base concrete's smoothing are the key prerequisites for determining the final floor effect and lifespan. The following are the detailed requirements and treatment procedures for the concrete base layer before grinding. The objective of the base concrete is to provide a "canvas" that is of high strength, dense and smooth, dry and clean, and free of defects. This refers to the operation carried out using a mechanical trowel during the period from the initial setting to the final setting of concrete. The requirements are far higher than those for ordinary concrete floors. The strength should not be lower than C25, and it is recommended to be above C30. The water-cement ratio should be low (generally ≤0.5) to reduce bleeding, enhance surface strength and wear resistance. The aggregate (sand and gravel) particle size is moderate and the mud content is low, ensuring a fine surface. It is necessary to vibrate thoroughly to expel air bubbles and ensure that the concrete is dense, free of voids and honeycombs. Preliminary leveling: After the concrete is laid, a laser screed or a scraper is used for initial leveling. Bleeding treatment: Allow the free water on the surface to fully evaporate. Start the operation before the initial setting (when the depth of the human footprint is about 2-3mm). The first coat of troweling (lifting the slurry) : Use a circular troweling machine to run at low speed to lift and smooth the surface slurry, filling in local unevenness. The second coat of smoothing (compaction) : When the surface moisture has further evaporated (and the footprints left by a person standing on it are very shallow), switch to a trowel blade (iron plate), run at medium speed, and apply in a cross direction to compact and smooth the surface. The third coat of polishing (fine polishing) : Before the concrete has finally set (with no standing water on the surface and slight marks when pressed by fingers), use a trowel blade to finely grind at high speed. This step is of vital importance as it can significantly enhance the surface density and flatness, resulting in a smooth and uniform hardened surface. When using a 2-meter straightedge for inspection, the gap should not exceed 3mm. The high-standard project requirement is ≤2mm. The overall slope should comply with the design requirements and there should be no water accumulation areas. After the smoothing is completed, full curing must be carried out immediately (it is recommended to cover with plastic film or spray a special curing agent) to prevent cracking due to excessive evaporation of water. The curing period should be no less than 7 days, with 14 to 28 days being the best. Even a well-polished floor must undergo strict inspection and targeted treatment before grinding. This stage is usually carried out after the concrete pouring and curing are completed (at least 28 days after the strength meets the standard). Strength: Tested by a rebound tester, the surface compressive strength is ≥ 25MPa. For curing agent floors, the higher the strength of the base layer, the better the final effect. Moisture content: Detected using an electronic hygrometer. Epoxy flooring has strict requirements (the moisture content of the base layer should be ≤ 4%, or as per the requirements of the material supplier). The curing agent floor has a relatively high tolerance for moisture, but it must not have standing water either. Flatness: Check again with a 2-meter straightedge and mark the areas that exceed the standard. Defect inspection: Carefully examine for hollowing (by tapping with a small hammer), cracks, oil stains, floating slurry, cement lumps, exposed steel bar ends, etc. Cleaning: Thoroughly sweep the floor and use an industrial vacuum cleaner to suck up all dust and sand particles. Hollowing and Defect repair Remove all hollow and loose parts. V-shaped grooves should be made for non-structural cracks, and they should be filled and repaired with high-strength non-shrinking epoxy resin or polymer cement mortar. The exposed ends of the steel bars on the ground should be cut to at least 3mm below the surface, then treated with anti-rust paint and filled with repair mortar. For local pits or height differences, they should be leveled with a professional grinding machine or milling machine and then filled with matching repair materials. Oil stain treatment: For oil stains, they must be thoroughly removed. Light oil stains can be wiped with special cleaning agents or solvents. Severely penetrating oil stains should be treated with fire roasting, milling or special degreasing agents. If necessary, the contaminated concrete should be knocked off and re-poured. Floating slurry and weak layer treatment: This is one of the core purposes of grinding. Even on a well-polished floor, there may still be a layer of cement slurry film (floating slurry) with relatively low strength formed due to bleeding on the surface. The primary task of the grinding machine is to remove this layer of floating Stage Key requirements for epoxy flooring Key requirements for concrete hardener flooring Polishing requirements Extremely high. The denser and flatter the surface is, the better the adhesion of the epoxy coating will be and the brighter and smoother the coating effect will be. It needs to be polished to perfection. High. The surface density directly affects the uniformity of the curing agent's penetration and the final hardening effect, and it also requires a fine finish. Strength requirements High (≥C25). The base layer is solid, and the coating is not prone to cracking due to base layer cracking. Very high (it is recommended to be ≥C30). The strength of the base layer is the foundation of the final strength, and the curing agent is an addition reaction. Moisture content requirement Extremely strict (≤4%). Moisture can cause the epoxy coating to bubble and delaminate. It should be relatively loose, but the ground must be dry and free of standing water. The curing agent can react with the hydration products of cement. Pretreatment before grinding The key points are absolute dryness, dust-free, oil-free and high flatness. The floating slurry layer must be removed to ensure adhesion. The key points are to remove the floating slurry, open the pores, deal with the defects and ensure the surface is smooth. Grinding opens up channels for the penetration of curing agents. Grinding particle size Usually, grinding to 80-120 mesh is sufficient to provide adequate roughness (anchor texture) for the epoxy primer. Usually, a coarser finish (such as starting at 30-40 mesh) is required to open up the surface, followed by multiple grinding processes to a higher mesh count (such as 1000-3000 mesh) for a brighter finish. Communication in advance: Before the concrete pouring, the floor construction unit should conduct a detailed technical briefing with the general contractor of the civil engineering, clearly defining the plastering standards and curing requirements. On-site supervision: The floor construction party should send personnel to supervise and guide during the concrete smoothing stage. System treatment: Regard the base treatment as a systematic project, from pouring to curing, and then to the inspection and repair before grinding, each step is interlinked and no step can be omitted. Professional assessment: For the renovation of old floors, a comprehensive assessment must be conducted by professionals before grinding, and a detailed treatment plan should be formulated. Only by following the above requirements and procedures can a perfect foundation be laid for the subsequent epoxy resin coating or concrete sealant and hardener construction, thereby creating a high-performance and long-life high-quality floor. Note: The parameters provided in this document are for reference only and are not mandatory. Due to differences in technical characteristics between different brands and models of laser levelers, please consult the manufacturer for a suitable solution before actual operation. This reference document assumes no responsibility for any issues arising from failure to follow the manufacturer's instructions.
Read More
October 23, 2024
Detailed explanation of application scope of laser leveling machine
Concrete laser leveling machine is widely used. It is an advanced machine used to super-flatten and level concrete floors. Its application range can be roughly divided into two categories: indoor floor engineering and outdoor floor engineering. These two categories are further subdivided. The following is a detailed introduction to the use of concrete laser leveling machine and the projects of this type that Vanse Machinery's products have done. Nowadays, concrete laser leveling machines are being used more and more widely. The specific scope of application can be divided into two categories: Vanse Machinery has done such projects as Harbin Haier workshop, Beijing Benz workshop, Baoding Great Wall Motors No. 5 spraying workshop, Shandong Classic Group steel structure production line workshop and other projects. Vanse Machinery has done such projects as: Suzhou Samsung Electronics Factory, Shandong Xingda Ecological Winery, Shandong Parkson Biological Workshop, Shandong Yuda Medical Workshop and other projects. Such projects that Vanse Machinery has done include: Xi'an Fuju Home Plaza, Shenzhen Walmart Supermarket, Wuhan Vipshop Logistics Park, Guangxi Convention and Exhibition Center, Tianjin Yupei Logistics Park and other projects. Such projects that Vanse Machinery has done include: Hubei Xiangzhou Industrial Park, Shanxi Shenlong Energy Coking and other projects. Such projects that Vanse Machinery has done include: Shandong Xinbaihui underground parking plant, Changchun FAW-Volkswagen parking lot, Hebei Hualian Supermarket large underground parking lot, Sichuan Wanda Plaza large underground parking lot, Hubei Xiangyang Dongjin Century City underground parking lot and other projects Such projects that Vanse Machinery has done include: Nanjing Huawei Electronics Company floor, Shenyang Electronics Factory floor integration, Sichuan Hualian Plaza, Hubei Xiangyang Dongjin Century City and other projects. Shandong Yanzhou Vanse Machinery Technology Co., Ltd. is the only high-tech enterprise in China that integrates R&D, manufacturing, sales, and technical services, specializing in concrete laser leveling machines. The use of "" brand concrete laser leveling machines can reduce about 60% of high-intensity labor, save about 50% of construction costs, shorten about 50% of construction period, and increase the strength and density of the floor by about 25%. The company has always been based on the tenet of "people-oriented, leading technology, honest management, and creating a well-known brand". We will provide customers with reliable products and perfect services, develop together, and create good results.
Read More
November 14, 2023
Laser leveling machine: a great assistant on construction sites
Wow, the laser leveler is really a great assistant for leveling large floors! In construction projects, concrete laser levelings really can handle a variety of challenges with ease. Telescopic arm laser leveling machine for large factory building construction Four-wheel laser leveling machine for large factory building construction Four-wheeled concrete laser leveling machine construction Telescopic arm concrete leveling Large telescopic arm laser leveling machine This magical device uses laser measurement technology and intelligent control system to give your concrete floor a new look, and get precise flatness easily! How does it work? To put it simply, the laser sensor emits a laser signal, then receives the signal reflected from the ground, compares it with the preset plane height, and automatically adjusts the height of the leveling knife through the intelligent control system to reach the preset plane height. Laser leveling machine steel mesh construction To sum up, the concrete laser leveling machine is really a practical construction engineering equipment, accurate, efficient and practical! However, when using it, we must also pay attention to some issues, such as environmental protection and energy saving. Therefore, when choosing a concrete laser leveling, we must comprehensively consider various factors to ensure construction quality and efficiency. In general, the concrete laser leveler is a good hand in construction projects, making our ground smoother and more beautiful!