Technical Knowledge

Power Trowel trowelling machine

May 16, 2019

Daily maintenance

750
Power Trowel trowelling machine 2
  1. After each work, clean the concrete and dust on the machine timely.

  2. It is recommended to replace the air filter once every 100 hours. In many dust areas, the frequency of cleaning and replacement should be increased.

  3. Replace the oil after the first 20 hours of operation, and then replace it every 100 hours. When disposing of the waste oil, it is recommended to put it in a sealable container and give it to the recycling center to protect the environment and soil

  4. Grease the grease nipple above the cross for daily maintenance

Share this article

About the Author: Shandong Vanse Machinery Technology Co., Ltd.

Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.

Shandong Vanse Machinery

Leading manufacturer specializing in high-performance concrete laser screeds, telescopic arm flatwork handlers, and mechanical ride-on power trowels.

Post overview

Need Machine Guidance?

Speak directly with Shandong Vanse field specialists for tailored equipment quotes and site planning.

Contact Us Today

Related Articles

You Might Also Like