Do you know the three major operating misunderstandings in concrete laser leveling machine maintenance?
December 1, 2023
The concrete laser leveler can meet the construction needs of large areas and high flatness and levelness. It plays a very important role in the construction process. After the equipment is used, I believe everyone knows the maintenance of the leveler. However, it is very likely that incorrect operations will occur during the maintenance process, which will only have the opposite effect. In this article, our staff will explain to you the three major maintenance misunderstandings of concrete laser leveling machines. 1. The bolts are too tight.The concrete laser leveling machine has many bolts and nuts. In order to make the connection reliable, it should be ensured that it has sufficient pre-tightening force. However, we should not mistakenly believe that the tighter the bolts are, the better. Blindly increasing the torque of the bolts will not only cause permanent deformation of the fasteners due to excessive external force, but also cause the threads of the screws to slip due to excessive tension. Or the screw is broken. 2. The tire pressure is too high.The tire inflation pressure of the concrete laser leveling is the main factor that determines its service life and working quality. When the air pressure is too low, the carcass deformation increases, which causes internal stress to increase, and accelerates rubber aging and cord fatigue; at the same time, rolling resistance increases, so tire shoulder wear intensifies. However, when the inflation pressure is too high, the tire cord will generate a lot of tension, weakening the resistance to impact, and the edges and corners of rocks can easily damage the tire; at the same time, the tire tread wear will increase, causing the tire to slip, which will reduce the efficiency of concrete laser leveling. machine operating efficiency. 3. When replacing the hydraulic oil, only drain the oil in the tank.The concrete laser leveler has many hydraulic components and requires sufficient hydraulic oil. Whenever the hydraulic oil deteriorates due to long use and needs to be replaced, there will always be people who mistakenly think that they only need to drain the oil in the hydraulic oil and fill it with new hydraulic oil. In fact, the correct oil change procedure should first drain the hydraulic oil in the hydraulic oil tank, then clean the oil tank and add new hydraulic oil; then remove the main circuit pipe, start the engine and run it at a low speed, which will cause the oil pump truck operator to operate manually. If Operate each mechanism separately, and only rely on hydraulic oil to drain the old oil in the circuit one by one until new oil flows out of the oil return main pipe; then connect the oil return main pipe to the oil tank, and then add new hydraulic pressure to the concrete laser leveling machine oil tank Oil to the specified position.
About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Is there have difference between floor paint and floor coating?
Floor paint and floor coatings differ in the following aspects: 1.Definition and properties Floor paint and floor paint are both coatings used for floor decoration and protection, but their properties and ingredients are different. Floor paint is a kind of paint with high hardness and wear resistance, which is mainly used to harden and protect the ground. It is usually composed of resin pigments, fillers, additives, etc., and has good wear resistance, pressure resistance and chemical corrosion resistance. Floor coating is a kind of coating mainly used for decoration and beautification of the ground, with high elasticity and gloss. It is usually composed of acrylic resin, pigments, fillers, additives, etc., and has good weather resistance, wear resistance and chemical corrosion resistance. 2.Construction technology The construction techniques of floor paint and floor coating are also different. The construction of floor paint usually requires smoothing the ground first, then applying primer, and finally applying topcoat. The construction process is relatively simple, but the construction temperature and humidity need to be strictly controlled to ensure the dry explosion and curing of the paint. The construction of floor coating requires multiple applications on a flat ground to achieve the desired decorative effect. The construction process is relatively complex, and the thickness and uniformity of each application need to be controlled to ensure the final decorative effect. 3. Scope of application Floor paint and floor coatings also differ in their scope of application. Floor paint is mainly used for floors that need to be hardened and protected in factories, warehouses, parking lots, etc. It can also be used for outdoor floors and garages. Due to its higher hardness and wear resistance, floor paint can provide better anti-slip effects. Floor coatings are mainly used in offices, conference rooms, restaurants, hospitals and other floors that require beautiful appearance and wear resistance. Due to its high elasticity and gloss, floor coatings can provide better decorative effects and usage experience. 4.Performance characteristics Floor paint and floor coatings also have different performance requirements. Floor paint has high hardness and wear resistance, which can provide better anti-slip effect and service life. At the same time, floor paint also has good chemical resistance and can adapt to various harsh environments. Floor coatings have high elasticity and gloss, which can provide better decorative effects and user experience. At the same time, floor coatings also have good weather resistance and wear resistance, and can adapt to various climate conditions and usage locations. 5. Price and cost performance The price and cost-effectiveness of floor paint and floor coatings are also different. Due to the high hardness and wear resistance of floor paint, its price is relatively high. However, due to its wide range of use, the price/performance ratio is relatively high. Floor paint is a good choice for floor locations that need to be hardened and protected. The price of floor coating is relatively low, but its decorative effect and use experience are better. For places where the floor needs to be beautiful and resistant to wear and tear, choosing floor paint is a good choice. Although its price is lower, its service life and weather resistance are better, so the price/performance ratio is relatively high. In short, there are differences between floor paint and floor coatings in terms of definition, properties, construction technology, scope of application, performance characteristics, price and cost-effectiveness. Choosing the right coating requires comprehensive consideration based on actual needs and usage locations.
Read More
June 28, 2019
Summer Concrete Construction Methods
In summer, the temperature is high and the drying is fast. The newly poured concrete may have an accelerated condensing speed and a decrease in strength. At this time, care should be taken when pouring, trimming and curing the concrete. First, mixing and transportation: When mixing, the measures should be taken to control the temperature rise of the crucible, and the additional water quantity should be controlled at one time to reduce the slump loss and reduce the plastic shrinkage cracking. The following measures can be taken during the mixing and transportation process. 1. Use water reducing agent or replace some cement with fly ash to reduce the amount of cement, and increase the aggregate particle size while the casting conditions allow. 2. If the transportation distance of the bismuth mixture is long, the setting time of the hydrazine can be controlled by a retarder, but it should be noted that the dosage of the retarder should be reasonable, especially for the large-scale slab floor project. 3. If you need a high slump bismuth mixture, use a superplasticizer. Some of the high- efficiency water reducing agent produced a slump of 2 h. The high-efficiency water reducing agent also reduces the friction between the aggregate particles during the mixing process and slows the heat accumulation in the mixing barrel. 4. In case of meeting the requirements of construction specifications, try to use slag Portland cement and fly ash Portland cement. 5. Sprinkle water into the aggregate to reduce the temperature of the aggregate; if it is sprayed with groundwater or well water, the cooling effect is better. 6. In the hot season or large volume concrete construction, cold water or ice cubes can be used instead of some mixing water. 7. For the long-distance transportation of sputum in the hot season, the delayed stirring of the mixer can be considered, so that the raft is still in agitating state when it arrives at the construction site. 8. It is recommended abroad to paint the outside of the drum of the mixer in white in the summer, so that the absorption of solar radiation by the drum is significantly reduced. In the summer, taking the transport distance of 1 h as an example, the temperature in the white mixing drum is at least 1 ° C lower than that in the conventional red mixing drum. 9. Construction organization design should be done to avoid pouring concrete at the highest temperature in the day. During the high temperature drying season, the evening pouring is relatively less affected by wind and temperature, and can be finally condensed near sunrise, while the relative humidity is high, so the possibility of early drying and cracking is minimal.
Read More
June 21, 2024
Common Problems in After-sales Service of Concrete Laser Leveling Machine
Concrete laser leveling machine is an indispensable and efficient construction equipment in modern construction projects. Its accurate leveling effect greatly improves the construction quality and efficiency. However, in the long-term use of the equipment, it is inevitable to encounter some common problems. This article will focus on several common after-sales problems of concrete laser leveling machine, combined with specific practical content, to provide detailed processing methods and suggestions, aiming to help users better use and maintain the equipment and ensure smooth construction. 1. Equipment startup failure handling Equipment startup failure is one of the common after-sales problems of concrete laser leveling machine. When the equipment cannot start normally, first check whether the power plug is plugged in and whether the power switch is in the on state. If the power supply is normal, it is necessary to further check whether the motor is damaged or the line is short-circuited. At this time, you can use tools such as a multimeter to troubleshoot. If it is determined that the motor is faulty, you should contact professional after-sales personnel for repair or replacement. At the same time, you should also pay attention to the voltage requirements when the equipment is started to avoid startup failures due to unstable voltage. 2. Laser system troubleshooting The laser system is the core component of the concrete laser leveling machine, and its stability and accuracy directly affect the leveling effect. The main manifestation of laser system failure is that the laser beam is unstable or cannot be emitted. When dealing with such problems, you should first check whether the laser transmitter is clean and whether there are any obstructions. At the same time, you should also check whether the position of the laser receiver is correct and whether the received signal is stable. If the laser system hardware is intact but there are still problems, you can try to calibrate or reset the laser system. If the problem still cannot be solved, you should contact professional after-sales personnel for inspection and repair. 3. Hydraulic system maintenance and care The hydraulic system is an important part of the concrete laser leveling machine, responsible for driving the movement of components such as the leveling blade. The maintenance and care of the hydraulic system is essential to ensure the normal operation of the equipment. In daily use, the oil level and quality of the hydraulic oil should be checked regularly to ensure that the oil is clean and free of impurities. At the same time, it is also necessary to check whether the hydraulic oil pipe has oil leakage or damage, and if so, it should be replaced in time. In addition, regular replacement of the hydraulic oil filter and cleaning of the oil tank are also necessary maintenance measures. During use, the equipment should be prevented from overloading for a long time to avoid damage to the hydraulic system. 4. Leveling effect adjustment method The leveling effect of the concrete laser leveling machine is affected by many factors, including the accuracy of the laser system, the angle and height of the blade, etc. When the leveling effect is not ideal, it can be improved by adjusting the relevant parameters. First, the parameters of the laser system, including the intensity and angle of the laser beam, can be adjusted to ensure that it can accurately reflect the height changes of the ground. Secondly, the angle and height of the blade can be adjusted so that it can better adapt to the ups and downs of the ground. In addition, the walking speed and leveling times of the equipment can be adjusted according to the specific construction requirements to achieve the best leveling effect. 5. Solution to motor overheating Motor overheating is one of the common faults of concrete laser leveling machines, which may cause equipment performance degradation or even damage. There may be many reasons for motor overheating, such as poor heat dissipation, excessive load or internal motor failure. When the motor is found to be overheated, first stop using the equipment immediately and check whether the cooling system is working properly. If there is no problem with the cooling system, check the load of the equipment to ensure that it is not overloaded. At the same time, it is also necessary to check whether the wiring of the motor is loose or in poor contact to avoid overheating due to excessive current. If the above measures cannot solve the problem, contact professional after-sales personnel for repair or replacement of the motor. 6. Replacement and purchase of wearing parts During the use of the Wenjie soil laser leveling machine, some wearing parts such as blades and filters will gradually wear or damage and need to be replaced regularly. When purchasing wearing parts, you should choose the brand and model that matches the original equipment to ensure that its performance and quality meet the requirements. At the same time, you should also pay attention to the installation and replacement methods of wearing parts to avoid damage to the equipment or affect the leveling effect due to improper operation. When replacing wearing parts, you should ensure that the power of the equipment is turned off and operate according to the instructions or the guidance of after-sales personnel. 7. Cleaning and maintenance suggestions for the whole machine Maintaining the cleanliness and good condition of the concrete laser leveling machine is crucial to extending the life of the equipment and improving work efficiency. In daily use, the equipment should be cleaned regularly, including cleaning the dust and dirt on the surface, wiping the mechanical parts and electrical components, etc. At the same time, it is also necessary to pay attention to the regular lubrication of the lubrication parts of the equipment to reduce friction and wear. In addition, when storing the equipment, you should choose a dry and ventilated place to avoid moisture or direct sunlight on the equipment. For equipment that is not used for a long time, it should be started and inspected regularly to ensure that its performance is not affected. In short, the handling of common after-sales problems of concrete laser leveling machines requires comprehensive consideration of the characteristics of the equipment itself and the use environment and other factors. Through in-depth understanding and effective handling of equipment startup failures, laser system failures, wave pressure system maintenance and maintenance alarm adjustment, motor overheating problem resolution, replacement and purchase of wearing parts, and cleaning and maintenance of the entire machine, the stable operation and efficient construction of the concrete laser leveling machine can be ensured. At the same time, users should also strengthen communication and cooperation with professional after-sales personnel so that they can get timely and effective support and help when encountering problems.
Read More
Online now. Replies personally on WhatsAppFionaCustomer specialist
Hi! I am here to help you find the right solution for your project.
You can share your product, capacity, or project needs. Our specialist will help you work out the next step.
Would you like a quick answer? Tap below to speak directly with our specialist on WhatsApp.