Technical Knowledge
Maintenance of underground parking lot floor
We often see some old underground parking lot floor has peeling, dust, cracks and other problems, most of which are caused by the back and forth rolling of cars, the ground did not do maintenance treatment.
Tips for curing concrete floor of parking lot.
If the dirt on the ground is serious, can choose neutral cleaner to clean, can also use general detergent to add a small concentration of water to make cleaning solution, oil pollution is more, can use the solution to clean.
After the completion of floor construction in the parking lot, maintenance must be carried out. During the maintenance period, no personnel or vehicles can enter. Generally, maintenance of the floor needs at least 7 days.
After being put into use, it is necessary to avoid heavy machines and objects directly hitting the floor, and sharp objects scratching the floor surface .I f the dirt on the ground is serious, can choose neutral cleaner to clean, can also use general detergent to add a small concentration of water to make cleaning solution, oil pollution is more, can use the solution to clean.
After the completion of floor construction in the parking lot, maintenance must be carried out. During the maintenance period, no personnel or vehicles can enter. Generally, maintenance of the floor needs at least 7 days.
Finally is the parking lot carrying items as far as possible to do light, avoid direct damage to the ground.
Share this article

About the Author: Shandong Vanse Machinery Technology Co., Ltd.
Shandong Vanse Machinery Technology Co., Ltd. is a high-tech manufacturer specializing in concrete construction machinery, including laser screeds and related equipment. The company integrates R&D, production, and global sales, with products exported to over 60 countries and widely used in infrastructure projects worldwide.
Previous Post
Next Post
Related Articles


